Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

EVM (Perform)

Showing 74

Dataclips refresh rate to be live rather than 4hours

No description provided
Rocky Ursino 28 days ago in EVM (Perform) / Analytics/Dashboards 0

Search by Work Ref Code, Cost Code in Dockets’

Adding additional search/filter options will assist team.
Rocky Ursino about 1 month ago in EVM (Perform) / Dockets 0

Include a Synchro Evacuation Process

This would assist the personnel, specifically the HSSE team on site when there is an evacuation emergency to manage the entire process. Synchro can add features below that can be used during an emergency evacuation: Supervisors seeing the names of...
Kaluba Josephine Changwe 6 months ago in EVM (Perform) / SYNCHRO Perform Mobile 1 Future Consideration

Sorting in Time and Usage Matrix for People and Equipment, company, resource role etc

Currently the Matrix is set up to include People and Equipment in 1 table with sorting by Company, Role and Name. It is quite time consuming to have people and equipment mixed together. It would be good to be able to keep them separated and sortin...
Nageshwar Sesetti about 3 years ago in EVM (Perform) / Timesheets 2 Future Consideration

Return Actual Cost to Work Inspector/Progress webpage

I note the New/Enhanced Feature for SYNCHRO Perform removed "Actual Cost" from the Progress page of the Work Inspector in 9-Jun-2024 update. This page reports "Revised Earned Cost" which is linked to the actual progress. This information is most u...
Ernest Downes about 1 year ago in EVM (Perform) / Progress Measurement 0 Already exists

Support to bulk upload Rates in Perform

Current method of loading and updating rates individually into Perform needs the ability to bulk create and needs to include notation to allow information on source
Ernest Downes over 3 years ago in EVM (Perform) / Dockets 0 Future Consideration

Expand subcontractor user permission

Allow Subcontractors to manage people data and supervisor roster, and run the Usage / Attendance / Exception reports / people exports
Duncan Turner over 1 year ago in EVM (Perform) / Administration 0 Future Consideration

SMU in Matrix

We have start and finish time in Matrix. For plant, could we have start and finish SMU in Matrix
Nageshwar Sesetti about 3 years ago in EVM (Perform) / Timesheets 1 Future Consideration

Work Reference Order in SYNCHRO Perform App

Allow for sort (or at minimum set sort order to ascending by default) on Work References in the SYNCHRO Perform Mobile App
Ernest Downes over 1 year ago in EVM (Perform) / SYNCHRO Perform Mobile 0 Future Consideration

Ability to upload multiple photos in one go against a Perform Work Reference in the web

Currently, a user needs to upload one photo at a time and add a comment. This feature would allow a user to add multiple photos to a Work Reference (Activity or Event) in one go
Luke Read over 3 years ago in EVM (Perform) / Photo Management 0 Future Consideration