Search results

Showing 8 of 8

Return Actual Cost to Work Inspector/Progress webpage

I note the New/Enhanced Feature for SYNCHRO Perform removed "Actual Cost" from the Progress page of the Work Inspector in 9-Jun-2024 update. This page reports "Revised Earned Cost" which is linked to the actual progress. This information is most u...
Ernest Downes 11 months ago in Perform / Progress Measurement 0 Already exists

Ability to see when a form was created in the register/list view

Please, provide ability to expose the date created for form instances in the List view. A built in property that can be exposed from the three vertical lines.This will help track changes and resolve issues. Current case is where a cascade was refr...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Planned

Ability to load multiple projects through Power BI Connector

Currently, I can only load one project at a time - If i want to aggregate data from multiple projects, and I run the Connector, it will create duplicates of the existing tables with a suffix (Query1, Query2, etc.), which becomes very hard to merge...
Arpit Prakash about 2 years ago in SYNCHRO Control 0 Future consideration

Use of same Filters and 3D Filters from SP file in 4D Review

In Synchro Pro and Open Viewer filtering can be used to simplify navigation of a 4D file. It would be nice to have the possibily to reuse these same filters in the 4D review environment as well.
Brigt Rykkje about 5 years ago in [Archive] SYNCHRO 4D Review 0 Planned

RFI Reference ID to be visible on the RFI Form

When commenting on the RFI following selection from the list, there is no id reference on the form itself. Everybody likes to confirm they have selected the correct item before executing an activity.
Guest almost 6 years ago in SYNCHRO Control 0 Shipped

the remove related records on demob does not work for future hours already added

should go and remove any hours that have been entered - we add bulk leave in advance which you cannot see on the people summary but are behind the scenes - was working but now is not
Cindy Anderson almost 3 years ago in Perform / Timesheets 1 Will not implement

Import History - UI/backend to persist configuration info across multiple files

A user can import Inspections with “clean import = false” and break up the configuration between two or more files, but the UI and pretty much all related infrastructure for Inspection configuration works under the assumption that the config is de...
Maria Bityutskaya almost 4 years ago in SYNCHRO Control / Inspection 0 Future consideration

Need to be able to attach Pdf sheet w/ Multiple plan locations to multiple map locations

Need a way to attach a sheet the shows two plan sheet on a single pdf. if we can make copy and add lable about Top/Bottom/ or Left/Right ect... See page 8,9, and 10 of attched planset . Can provide more examples if needed
Dan Sheldon about 4 years ago in SYNCHRO Control / Plan Sets 1 Future consideration