Search results: SYNCHRO 4D Pro

Showing 9 of 26

Default to Window Placement #4

As an enterprise, we need the ability to default a window placement for our users. Our teams are used to seeing a similar layout to Window Placement number 4 in other CPM Scheduling Tools. We would like to scale the use of Synchro Scheduler to rep...
Thomas Whiteley almost 3 years ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 0

Support for IFC 4 and 4x1

I work with linear Projects. Trains, Roads, Bridges. Most of these Software have recently added IFC support, but only for the schema 4x1 because it's the only one that supports alignments. Please, add it. It's very painful to go back to dwg just b...
Guest over 5 years ago in SYNCHRO 4D Pro / Integrations 2 Future consideration

Showing all active Resources for a look ahead period

I am trying to generate look ahead prints with all active 3D resources visible for that look ahead period instead of just the active Resources of the Focus Time. Example: show all tasks in between 25th of July '22 and 21st of August '22.I would li...
Stephan Klotz almost 3 years ago in SYNCHRO 4D Pro / Filters/Tables 1 Already exists

Issues on grouping WBS schedule in Synchro

I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Nabila Shahilla over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration

Synchro 4D Pro Gantt and EVM configuration improvement

As per Arpit's response, none of the features required below are possible in Synchro, it would be a meaningful improvement if Synchro aspires to be a tool to be used for construction/planning management rather than only 4D: Hi, I'm trying to do so...
Rafael Vendrame about 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Improve RG as the concept of Crew

Currently Pro has some advanced features for resource loading, resource usage spreadsheet, etc. To take it to the next level, it would be a good idea to implement RG in a similar as Resources. A thought would be to use RG as a Crew. A crew is a co...
Dimitrios Mitritsios over 4 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Future consideration

Calendar and Resource Units

NTI reported the following issue - 1) Create a calendar with custom working hours - for example, 7.5 hours per day 2) Create a resource (optional to assign the resource calendar to this custom calendar) 3) Assign this resource to a task with durat...
Guest over 4 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Shipped

Ability to Group multiple 3D Objects in the 3D Object Window

eg; Level 1 Formwork has 20 objects. For Level 2, Level 1 can be copied and pasted, likewise for Level 3, 4, etc. However with this grouping feature it is currently very time consuming to highlight and rename the pasted objects to then assign to a...
Guest over 4 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Color mode showing 3d filters and apperance profiles

i need to make reports where i want the apperance profiles that i have but filtered down to a 4 week look ahead. currently the only way to show the filtered tasks in the 3D window is to change the color mode. doing this overides the apperance prof...
Guest about 5 years ago in SYNCHRO 4D Pro 0 Future consideration