Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.
Currently in synchro Control \ Schedule the animation is starting at the Project Start Date.
Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas
over 3 years ago
in SYNCHRO Control
1
Future consideration
Ability to filter/select PDF settings plan sheets by user defined tags.
In the PDF Settings selection under administration in SYNCHRO control we only have the ability to filter by all sheets, published or draft. A document controller needs the ability to have more options available to view plan sheets in case modifica...
1. Allow Project Admins/Project Owners/Document Controller to Delete Forms created in error in progress 2. Allow admins to download a list of all Bindings. 3. Delete Binding Created by Administrator4. Have a separate Test Area in Control, within t...