Bulk Import - fail help

No assistance from ‘Published’ upon completion of the bulk import, just success i.e. if the import fails there is no help to fix the import worksheets. Would be nice for the user to understand why it failed and give feedback.
John Todd almost 2 years ago in SYNCHRO Control / Inspection 0 Future consideration

Revision Control Upgrade

No bulk importing revision control, this means the import spreadsheet (revisions) will be held outside of the product. Would like to have some type of revision control inside the SYNCHRO web page
John Todd almost 2 years ago in SYNCHRO Control / Inspection 0 Future consideration

move the card to header bar and shrink to save space for more important info

hello - refer to the screenshot.
Shaohua Guan almost 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Improve RG as the concept of Crew

Currently Pro has some advanced features for resource loading, resource usage spreadsheet, etc. To take it to the next level, it would be a good idea to implement RG in a similar as Resources. A thought would be to use RG as a Crew. A crew is a co...
Dimitrios Mitritsios over 3 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Future consideration

Remove sort on this page

only 10 projects are being displayed. Sort can be deleted. or change it to "All Projects" at the bottom.
Shaohua Guan almost 2 years ago in SYNCHRO Control / Admin 1 Will not implement

Task progressing

Allow users with proper RBAC Scheduling permissions (read/write for task actuals) to status Tasks - Set status to Started or Finished. For task status set to Started - let user input Actual start date and time, % complete For task status set to Fi...
Jacqueline Chen over 3 years ago in Field / Status update | Tasks 1 Planned

indicate the escalation info in the pdf report export if one form is escalated to another form

for example, form A is escalated to form B. When form A or form B is exported, it doesn't state the information/statement of this escalation (e.g. form A is escalated to form B) in the export PDF.
Siti Nurhazirah Mokmin over 3 years ago in SYNCHRO Control / Reports 0 Future consideration

direct link between individual model elements to drawings in documents

all elements, if configured, should be linked to live documents on Control when user click on one element, it will take to the right drawing within Control. It could be a tag, an url, or simply the name of the document and stored in the section sh...
Shaohua Guan almost 4 years ago in SYNCHRO Control / Models 0 Future consideration

Layouts and speed

Hi, Would be great when alternating Layouts the speed would also change. Perhaps make it optional to store or not the speed…
Guest almost 4 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Constants to work on Filters

Hi I would like to be able to use a Constant to Filter Tasks and 3D simultaneously.
Guest almost 4 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration