Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1211

Work Reference Order in SYNCHRO Perform App

Allow for sort (or at minimum set sort order to ascending by default) on Work References in the SYNCHRO Perform Mobile App
Ernest Downes 3 months ago in SYNCHRO Perform / SYNCHRO Perform Mobile 0

Shared With in PowerBI Connector

The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Indrawan Wijaya 2 months ago in SYNCHRO Control / APIs 0

Ability to map survey responses to different field types like text and checkboxes

Arpit Prakash 3 months ago in SYNCHRO Control / Forms 0

Batch load/unload 3D objects by filters

The issue described here: https://communities.bentley.com/products/construction/f/synchro-construction-forum/255742/synchro-4d-pro---unload-3d-objects-by-multiple-filters I would consider utilising the Filters tab in 3D View properties window for ...
Patryk Makowski 5 months ago in SYNCHRO 4D Pro / Filters/Tables 0 Likely to implement

Add the ability to create schedules for many models of one SynchroControl project.

Currently only one SynchroControl project model can be configured for the scheduling service ("Set up this iModel for scheduling service"). When a project is large in size or diligent, it is more convenient to split it into several models. Moreove...
Guest over 3 years ago in SYNCHRO Control / Admin 0 Future consideration

Add setting option to change "Scope" from Element to Top Assembly

In Synchro Control, we can set the scope to "Top Assembly", which allows us to select part of a cell (from ORD/microstation) and the Properties tab will display the full parent element properties, which is where we have item type data attached. In...
Guest about 1 month ago in SYNCHRO Field / Models | Tools 0

Support ARM processors for SYNCHRO 4D

Currently the installation won't allow the product to be installed on ARM processors within Windows. Allowing this should also enable "Mac OS" compatibility as many use Parallels Desktop, etc. With the new suite of Microsoft Surface Pros, etc, usi...
Bernhard Budiono about 1 month ago in SYNCHRO 4D Pro 0

Show PDF page break on forms designer

It would be really helpful if the Forms Designer had a page break indicator for a standard 8 1/2 by 11 page
Sarah Albee 4 months ago in SYNCHRO Control / Forms 0

Ability to select Control by Binding Name

No description provided
Arpit Prakash 4 months ago in SYNCHRO Control / Forms 0

Export PDF without folder if no attachments available

This issue is in regards to exporting a PDF. When exporting a PDF to ProjectWise, a folder is created in ProjectWise with the exported PDF inside the folder. Is there a way to just export the PDF form without the addition of a folder. The AO that ...
Arpit Prakash 4 months ago in SYNCHRO Control / Forms 0 Likely to implement