Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1286

Return Actual Cost to Work Inspector/Progress webpage

I note the New/Enhanced Feature for SYNCHRO Perform removed "Actual Cost" from the Progress page of the Work Inspector in 9-Jun-2024 update. This page reports "Revised Earned Cost" which is linked to the actual progress. This information is most u...
Ernest Downes 4 months ago in Perform / Progress Measurement 0

Ensuring Persistent Visibility of 'Assigned To' Information Throughout the Workflow

Once someone is assigned in a form as ‘Assigned to,’ I would like that information to remain visible throughout the entire workflow. a solution could be that whenever a person is in the binding 'Assigned to' during the workflow, each time someone...
Yessica Barbosa 2 months ago in SYNCHRO Control 0

Contractor RFI Usage

It would be ideal be able to select the contract package and RFI is associated with. IE: SC01 - Civil Site, SC02 - Foundations, SC03 - Electrical, and on the RFI number it could be auto numbered as RFI-SC01-0001, RFI-SC02-0001. Allowing Contractor...
Guest almost 2 years ago in SYNCHRO Control / Admin 0 Future consideration

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas over 1 year ago in SYNCHRO Control / Models 7 Future consideration

Delete individual slices instead of merging whole element

When using Synchro Modeler, you can create various slices to subdivide an element. It is not possible to delete just one slice, instead you can only merge the element so that all of the slices are deleted. This is a big problem if many slices have...
Ruth Fuller over 1 year ago in SYNCHRO Modeler 2 Needs review

Ability to set Today's Date as a Binding in Forms

No description provided
Arpit Prakash 3 months ago in SYNCHRO Control / Forms 0

Ability to map data from Weather Widget Control to a fillable PDF

No description provided
Arpit Prakash 4 months ago in SYNCHRO Control / Forms 0

Ability to export Forms as PDF

No description provided
Arpit Prakash about 1 year ago in Field / Forms | Forms 1 Future Consideration

Easier Location of equipment using synchro field

In a big site where you have thousands of supports, piping and cabinets in various floors, It is practically difficult locating installed equipment on site. as the equipment are only liked via schedule, because everything is greyed out, you don't ...
Gareth Odiakose about 1 month ago in Field / Status update | Tasks 0

Dissociate Plan Set admin setting from Edit project detail setting

Currently, if a Role only has Plan Set admin checked but not Edit Project Detail, they will not see Plan Set options under Admin. Project settings and Plan Set settings are relevant to different personas, so need not be connected.
Arpit Prakash 5 months ago in SYNCHRO Control / Admin 0