Dissociate Plan Set admin setting from Edit project detail setting
Currently, if a Role only has Plan Set admin checked but not Edit Project Detail, they will not see Plan Set options under Admin. Project settings and Plan Set settings are relevant to different personas, so need not be connected.
Related forms to be bound to a specific location or control in a form.
When we relate forms we usually do that for a specific reason or as a workaround to raise a form from within a form. When related currently the forms are showing bunched up together with no sensible order or context. As a user I want to see the es...
We would like to see the ProjectWise Web + Microsoft Teams integration expanded to support Synchro Control projects. Currently, we can add Control projects as Web pages in Teams, but we would prefer if we could use the PW Teams integration that we...
If we can do more calculation for the DateTime and Date component. Example: Get the Duration between two date or date time. the duration will be number, can be set as day our hour or minute. Can add a Date component with number box component. Righ...
Indrawan Gmail
almost 3 years ago
in SYNCHRO Control / Forms
0
Future consideration
Trailing zeros not showing up on the "Decimal" Numberbox Field
Currently, trailing zeros (trailing zeros are a sequence of 0 in the decimal representation of a number, after which no other digits follow ) do not show up, when using a "decimal " numberbox field . There should be a button (per example) allowing...
Previously created Actions/Scripts should not be deleted if the inspection forms are updated via Excel upload. The desired behavior is error messages in Actions if bindings are not found.