Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1342 of 1342

Add options to query quantities by Work Areas

Probably will need some details here.
Sarah Ruckhaus 4 months ago in SYNCHRO Modeler / Slice / Work Area 2 Future consideration

Show more parent element's properties in QTO - HIGH PRIORITY

Parent properties for sliced Detailing Elements - Sliced elements only retain limited physical properties, which is limiting when doing cost codes in Modeler, or other auto matching in 4D Pro. User would like to see parent properties in this dropd...
Arpit Prakash 4 months ago in SYNCHRO Modeler / Slice 2 Needs review

Select elements from multiple selected work areas - High Priority

Cannot select multiple Work Areas - HIGH PRIORITY We typically create multiple small work areas per phases by selecting polygons in the iModel. E.g. Phase 1-Step 1.1, Phase 2- Step1.2, etc. This makes it easier to adapt to work area polygon change...
Arpit Prakash 4 months ago in SYNCHRO Modeler / Work Area 2 Planned

Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule

Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro. These layouts must include : - Schedule Tasks Group and Sort, - Schedules tasks filters, - Relevant Schedule Tasks Attrib...
Thibault Dumas almost 4 years ago in SYNCHRO Control / Models 1 Planned

smoother and faster navigation in iModel

users and project team have feedback that SYNCHRO Control iModel navigation is laggy and slow. please look into the matter so that the model can orbit and rotate smoother and faster.
Guest about 4 years ago in SYNCHRO Control / Models 2 Already exists

Add scheduling services to composite iModels

Add scheduling services to composite iModels to create 4D models.
Kevin Vivien about 1 year ago in SYNCHRO Control / Models 1

Ability to maintain folder mapping for PDF export through Forms Workflow

If a PDF is set to auto-export at a specific folder location within Documents, using Forms > Workflow > Transition, that path is not maintained through provisioning to a production project.
Arpit Prakash about 1 year ago in SYNCHRO Control 0

Ability to bulk create Actions/Scripts through Excel Configuration Spreadsheet

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms / Inspection 0 Planned

Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro

In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 0 Future consideration

Display the location of the user on the model

Enable GPS location of user on the model (the "blue dot"), based on the device location service, to allow a user to better orient themselves while on the construction site. UPD.: "As a field engineer, I want the mobile app to display my current lo...
Luke Read 9 months ago in Field / Models | Display 0 Future Consideration