Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1037

indicate the escalation info in the pdf report export if one form is escalated to another form

for example, form A is escalated to form B. When form A or form B is exported, it doesn't state the information/statement of this escalation (e.g. form A is escalated to form B) in the export PDF.
Siti Nurhazirah Mokmin over 4 years ago in SYNCHRO Control / Reports 0 Future consideration

Allow for High Res Photos to be captured in the Docket Form / Mobile App

Requested via https://envisionapp.zendesk.com/agent/tickets/6575 for QBC. Photo resolution in the docket form is significantly worse than the same photo taken within the photo and comments form
Bernhard Budiono over 2 years ago in EVM (Perform) / Dockets 1 Future Consideration

direct link between individual model elements to drawings in documents

all elements, if configured, should be linked to live documents on Control when user click on one element, it will take to the right drawing within Control. It could be a tag, an url, or simply the name of the document and stored in the section sh...
Shaohua Guan over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Documents Count and Selection

Under the documents Module, User would like to see a count of the files that are selected in a folder and a count of documents under that folder
Derryl Acosta over 4 years ago in SYNCHRO Control / Documents 0 Already exists

Ability to load multiple projects through Power BI Connector

Currently, I can only load one project at a time - If i want to aggregate data from multiple projects, and I run the Connector, it will create duplicates of the existing tables with a suffix (Query1, Query2, etc.), which becomes very hard to merge...
Arpit Prakash over 2 years ago in SYNCHRO Control 0 Future consideration

See Cost Codes in Control

Want to see Cost Codes assinged in Modeler in Control on the elements
Dan Sheldon over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Project Environment Size

Hi SYNCHRO Team, It would be great if I could tell the data size each project environment is currently using. This is so I can allocate the appropriate server space to collect and store the information currently inside, for archival purposes.
Guest over 2 years ago in SYNCHRO Control / Admin 0 Will not implement

PDF version compare in order to view sheet to sheet or older versions and not just to the current.

Some organizations use sperate existing layout sheet and proposed layout sheet, I want to able to compare the two different sheets. When multiple revision sheets exist for a single sheet, I would like to be able to compare the revisions, i.e. vers...
Kerry Newbanks over 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Add "sync" button to tasks view

If you want to update statuses in the Field App you have to select "Status Update" in the "More" tab. Once you make your updates you have to back out of the tasks window back into the "More" tab then select "sync". Wouldn't be simpler to have a sy...
Philip Breeden over 2 years ago in Field / Status update | Tasks 1 Planned

Add a "Critical Path" icon to those objects who have critical path activities associated with them

I feel this would be helpful for users in the field to see if a model object is associated with a critical path schedule activity.
Philip Breeden over 2 years ago in Field / Models | Display 1 Future Consideration