Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1339

Include a Synchro Evacuation Process

This would assist the personnel, specifically the HSSE team on site when there is an evacuation emergency to manage the entire process. Synchro can add features below that can be used during an emergency evacuation: Supervisors seeing the names of...
Kaluba Josephine Changwe 4 months ago in EVM (Perform) / SYNCHRO Perform Mobile 1 Future Consideration

Ability to bulk create Actions/Scripts through Excel Configuration Spreadsheet

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms / Inspection 0 Planned

Dashboards - to add customisation so that we can determine the property that the charts can be displayed

We hope to be able to customise the dashboards according to the properties and bindings that we require, as well as the ability to drill down, similar to Connect services dashboards
Guest over 4 years ago in SYNCHRO Control / Reports 1 Future consideration

Ability to manually save changes in Forms Designer

When designing large Forms, the performance heavily degrades on any action like selection, editing, etc, due to auto-save continuously running in the background. This could be a toggle to enable/disable as required.
Arpit Prakash 12 months ago in SYNCHRO Control / Forms 0

Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule

Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro. These layouts must include : - Schedule Tasks Group and Sort, - Schedules tasks filters, - Relevant Schedule Tasks Attrib...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Planned

smoother and faster navigation in iModel

users and project team have feedback that SYNCHRO Control iModel navigation is laggy and slow. please look into the matter so that the model can orbit and rotate smoother and faster.
Guest almost 4 years ago in SYNCHRO Control / Models 2 Already exists

Add scheduling services to composite iModels

Add scheduling services to composite iModels to create 4D models.
Kevin Vivien 12 months ago in SYNCHRO Control / Models 0

Add Work Area tag to elements automatically after creating Work Areas

No description provided
Johannes Yu 8 months ago in SYNCHRO Modeler 0 Needs review

Add a georeferenced image file to replace default satellite image

The default satellite images in the Forms are quite out of date. It would be good to be able to incorporate a georeferenced image file into the map to overlay or replace the existing satellite image. We collect these using UAVs at our construction...
Sheila Bjerreskov 2 months ago in SYNCHRO Control / Maps 0

Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro

In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 0 Future consideration