PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 242

Importing from Revit with metric reverts unit to feet unless settings are adjusted in 3D Import dialog

There is one bug I have found, it’s an easy fix but took a while to figure out: When importing spx files from revit using the import project, it will assume the default unit as feet even though revit and synchro are both setup in metric. The way t...
Guest almost 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Setting for appearance profile behavior for overlapping tasks

When there is one resource assigned to multiple overlapping tasks the behavior regarding which profile should be shown is not consistent. This idea adds a setting that would make it consistent. This is how the setting should work: Scenario 1 Given...
Tom Fry 9 months ago in SYNCHRO 4D Pro 1

Be able to add GeoTIFF or place images as textured plane on coordinates

Being able to do this would improve the current workflow (manual placement of textured plane on a 2D raster that is imported as 3D) Improvement in Quality (exact placement) Improvement in efficiency (no manual placement)
Bram Wildekamp about 3 years ago in SYNCHRO 4D Pro / Import/Export 2 Future consideration

3D View Focus Time Date - Display First Day of Week

This is useful because we would like to be able to show the week commencing date in the 3D view focus time. Currently we set the project focus time to the end of each week (Sunday) in order to capture all the activities happening, however this mea...
Daniel Clayson about 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Future consideration

Undo feature (not rollback)

There is a lack of an "Undo" feature. In P6 we are able to go back if something was keyed in incorrectly. A rollback is not always practical. We would like the application to allow for 1-3 user undo requests.
Jason Summers about 3 years ago in SYNCHRO 4D Pro 0 Will not implement

Do Rotation Easily - 3D Object that not at 90degree position with XY axis

We have user complaining that it is difficult to do 3D if the 3D object not at 90degree position with the XYZ axis. Please check this video attached. May be by adding the Degree configuration at the Alignment can solve this one?
Indrawan Gmail over 2 years ago in SYNCHRO 4D Pro / Animations 0

Physical Quantity distribution in Task Usage

It would be very helpful to see a physical quantity, its cost (or task cost) and their distribution in the "task usage report"
Varvara Kleshchevnikova almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Adding point cloud support

It would be nice to have point cloud integration in Synchro, especially for site logistic planning. The google map or Infraworks model seems out of date most of time when we try to plan pump location and truck route in reality.
Guest over 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Synchro_Resource Leveling/takt planning

Myself, a synchro user from Germany.I have developed a 4D BIM simulation with concrete quantity forecast in my new project .Now I would like to do a Resource levelling or takt planning.The peak demands needs to be balanced .Is there any solution a...
Guest almost 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

Ability to filter by WBS and Path

A good WBS is the core to most schedules and the ability to quickly filter by WBS levels or groups is a much used feature in P6 and other scheduling tools I would like to do in Synchro. The current work arounds I use are 1) Manually select the des...
Kristina Henkai about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration