Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1302 of 1302

Edit Work Area - Remove Component from Work Area

Right now, we can not remove component from Work Area after the Work Area created.
Indrawan Wijaya almost 2 years ago in SYNCHRO Modeler 0 Needs review

[SHARE Document] It would be Helpful if Roles would be in Alpha order when assigning Permissions.

It would be Helpful if Roles would be in Alpha order when assigning Permissions. Right now the roles are in a random order that do not make sense. This is SHARE permission on document folders
David Dudek Jr. almost 2 years ago in SYNCHRO Control / Documents 0 Future consideration

Issues on grouping WBS schedule in Synchro

I have encounter issues when I want to group my WBS based on work package then followed by WBS Name in Synchro My original schedule is based on Image 1 (From Left) When I did the grouping in Synchro (Image 2 and 3), it showed WBS workpackage follo...
Nabila Shahilla almost 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1 Future consideration

Track time/duration used for payment application

currently only dollar amount is tracked when issuing payment application. User needs to track time/duration used for each payment application and calculate remaining duration for the contract.
Shaohua Guan 11 months ago in Contracts 0

Able to Set Form Status for Multi Form Selected (SYNCHRO Form Manager)

Can set Form Status for Multi form Selected (in Form Manager) Current we must set the Form Status one bye one. Example: Set All Form Design to Draft. or Publish multi form in one click. Thank you.
Indrawan Wijaya almost 2 years ago in SYNCHRO Control / Forms 1 Planned

Anchoring of Camera with task during animation

It is useful because each time after importing revised or updated schedule with varied timeframe, we have to set camera which is very time taking and repeating. So, if we can avoid it by anchoring the camera with task it would much easier and time...
Vikash Singh almost 2 years ago in SYNCHRO 4D Pro / Animations 0 Will not implement

Auto populate fields when publish plan set for bulk upload

Right now, users need to manually type in Sheet #, Discipline, Revision, and Revision date when the publishing plan set. These fields along with Type and Sheet name being auto-populated according to the content of the uploaded PDFs when bulk uploa...
Shaohua Guan 11 months ago in SYNCHRO Control / Plan Sets 0

Based on 4D Pro's Task Name when creating a form.

When a user creates a form in 'My work', he wants to create it based on the Task Name of 4D Pro, like Perform. He said that it can be used to input the quantity value for each task in the field.
HoSang Jeon almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Allow different SYNCHRO Forms permissions to be set at various workflow states

Currently, we can assign each user role a set of permissions (e.g. View, Create and Edit, Assign). With role-based access control, for each user, we can restrict access to workflow state changes of forms and form visibility. However, this is still...
Guest over 3 years ago in SYNCHRO Control / Forms 2 Future consideration

Ability to calculate slice lengths for slices made through Work Area from graphic tool

Currently, the Slice Lengths are only calculated for slices made through Quantity Take-Off View > Slice tools. The slices made through Area Break Down View > Work Area from the Graphic tool do not compute the lengths.
Arpit Prakash almost 2 years ago in SYNCHRO Modeler 0 Needs review