PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1303

Get overview of "local" connectors from within the cloud environment

I sometimes use the iTwin Synchroniser from my desktop to directly synchronize models from a local source to the iModel. This means I don't have to first upload them, makes it also easier to deal with versioning. Unfortunately outside of the local...
Johan De Cock 11 months ago in SYNCHRO Control / Models 0

Allow GCS Reprojection

I often have models or drawings that are not created in the same (/correct) local coordinate system. In Microstation application it is possible to assign GCS to those different files and then reference them with "GCS reprojection". Meaning that th...
Johan De Cock 11 months ago in SYNCHRO Control / Models 0 Planned

Linking Forms together - Conditional and non-conditional

As a User, I want to Ad-hoc link forms together with relationships that form larger project workflows. The user should be able to state if they are conditional links (requiring the new forms to be completed before primary can proceed) or non-condi...
Noel Gonzalez-Jones almost 2 years ago in SYNCHRO Control 0

Window Selection to Progressing in Field App

Able to select item using window selection in update status mode.
Indrawan Wijaya over 3 years ago in Field / Status update | Resources 0 Planned

All bindings should not populate in the workflows if those are not part of Form

Presently binding those are not part of form are also populating with in Status (Enable and disable properties boxes). I understand that bindings are company/projectwide. If I am having 50 forms per project, in this case it's really difficult to f...
Sachin Sharma over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Multiple colormode in 3D view the same as Synchro 4D Pro

if you work in Synchro 4D Pro in an different colormode than Appearence profiles than it is not possible to see this colormode in Synchro Control. We would like to have the same color mode options that is available in Synchro 4D Pro also in Synchr...
Martijn Querner over 2 years ago in SYNCHRO Control / Models 0

Primary model in synchro control

There must be an option to make any model in a project in synchro control to be made as primary.
Jerry David Jaypaul almost 2 years ago in SYNCHRO Control / Models 0

QTY this period in Payment applications

You should also be able to enter a quantity and not only the price. You need to calculate the amount before entering it, but if you just enter the quantity of work the amount is automatically calculated.
Asbjørn Jon Ørrild almost 2 years ago in Contracts 0 Planned

Display Focus Time

Users have told me that they really want SYNCHRO Control to display Focus Time like 4D Pro does.
HoSang Jeon almost 2 years ago in SYNCHRO Control / Models 0

Player buttons for 4D review

Users say SYNCHRO Control really needs player buttons for 4D review, just like 4D Pro.
HoSang Jeon almost 2 years ago in SYNCHRO Control / Models 0