Pinned ideas

PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

SYNCHRO 4D Pro

Showing 238

Setting for appearance profile behavior for overlapping tasks

When there is one resource assigned to multiple overlapping tasks the behavior regarding which profile should be shown is not consistent. This idea adds a setting that would make it consistent. This is how the setting should work: Scenario 1 Given...
Tom Fry 7 months ago in SYNCHRO 4D Pro 1

Rollback UX improvements

Include roll back option as separate permissions in the roles. In large projects you don't want roll back to be available to everyone. Now we can't see what changes were made by who and what the impact is on the work that is done. There is also no...
Martijn Querner almost 2 years ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

Material Texture Option

photo texture/ texture to model- images mapped to the surface of model for realistic material.
ASHWIN RAJESH K about 1 year ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 1 Already exists

Support for 3D Connexion mouse

No description provided
Guest almost 5 years ago in SYNCHRO 4D Pro / Integrations / SYNCHRO Open Viewer 3 Future consideration

WBS/Codes grouping in Task/Resource usage spred

Please, make it possible to group tasks / resources in the task / resource usage spreadsheet by WBS/Codes, like Primavera does
Igor Saenko almost 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Reflect simultaneous activities with different locations in a 4D animation

In road projects where there are different sections and different construction elements in which there are several tasks occurring at the same time in different locations, I would like to reflect simultaneous tasks with different locations in a 4D...
Sergi Ferrater 8 months ago in SYNCHRO 4D Pro / Animations 1

Support for IFC 4 and 4x1

I work with linear Projects. Trains, Roads, Bridges. Most of these Software have recently added IFC support, but only for the schema 4x1 because it's the only one that supports alignments. Please, add it. It's very painful to go back to dwg just b...
Guest over 4 years ago in SYNCHRO 4D Pro / Integrations 1 Future consideration

Activity Code Descriptions in the Scheduler

Primavera P6 allows for viewing activity code descriptions for grouping tasks rather than just the activity code. The activity code is usually a batch of symbols due to P6'es character limits for activity codes and that makes it a real pain in Syn...
Patryk Makowski 9 months ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 7

Multiple Colour Modes In 1 3D View

Being able to have multiple colour modes in 1 3D view will be very helpful as it allows you to be able to fully customize your outputs. An example of where this is useful could be showing the different pouring stages of concrete using activity tra...
Daniel Clayson almost 3 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Will not implement

Importing from Revit with metric reverts unit to feet unless settings are adjusted in 3D Import dialog

There is one bug I have found, it’s an easy fix but took a while to figure out: When importing spx files from revit using the import project, it will assume the default unit as feet even though revit and synchro are both setup in metric. The way t...
Guest almost 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration