This is esp. helpful when setting up a template projects and provisioning them to production. Bindings could be map to project metadata like Project Name, No. etc, and be autofilled in all Form definitions.
When users are filling out a Form show message all Required fields need to be populated before continuing.
When users are filling out a Form show message all Required fields need to be populated before continuing. Once all required fields are filled in then the message should disappear.
Email notifications showing mis-leading information
Ability to change the basic email notification sent out. Currently the email notification includes info like Created by and Created on, which COUNTERINTUITIVELY tells the user who has DESIGNED this form and WHEN IT WAS DESINGED.. instead of showin...
It would be usefull to have a way to also include attachments, as we do through the normal PDF export (in a folder for attachments), using the transition button in the workflow
Joana Isabel Neves Gomes
10 months ago
in SYNCHRO Control / Forms
0
Future consideration
synchronise saved views between synchro imodel and connect design review / itwinhub
it would be great that the saved views created in synchro control imodel could be automatically synchronized over to the other platform / services such as design review and itwin hub
Ability to save and share dimensions/information from Measurement Tools
This would be extremely helpful when trying to convey information between stakeholders and allow for consistent information sharing as it is not always easy to target and select the exact point you are measuring in the model. Having the ability to...
Hi, Currently we can only graphically visualize the 3D resources assigned to tasks when the task is selected. Our users would like to see also the traditional resources that are assigned to tasks, i.e. human resources. This can be added in Task Pr...