Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1310

Import Viewpoints (3D Filters) from SYNCHRO Pro

Its easier to create Viewpoints with powerful filtering options within Pro. Also dont want to duplicate efforts of recreating them in Control.
Arpit Prakash over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Allow user list to populate Assigned to

Currently, the system binding Assigned to is able to be used to populate user lists using scrips, but not the other way around. By allowing the user lists to populate this system binding we can automate workflows and reduce the manual work for use...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Add more system bindings to reference users

Currently, system bindings only include Assigned to and Assigned users. To simplify script configurations and allow for more automated workflows, there is a need to include more. Created by - This would allow a script or a workflow transition to s...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Calendar view for all forms types

Calendar view of all due dates in "My Work" is great but a similar view for individual form types would be beneficial for users that need to triage work for specific forms types.
Ryan Posnikoff over 1 year ago in SYNCHRO Control / Forms 1 Future consideration

Ability to unlock locked folders by an Admin

A folder can be locked by any Role having corresponding permissions, however, there may be instances when the user is not available to grant access to the files.
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Assign Resource Group to Task - New button

It is nive to have this new button. Assign Resource Group to Task. Please see image on the attachment.
Indrawan Gmail over 2 years ago in SYNCHRO 4D Pro 0 Planned

Filter columns in Control by multiple values

An example would be selecting multiple options under Status (Inreview & Approved) to exclude the ones we don’t want to see
Thomas Schimpf over 2 years ago in SYNCHRO Control / Reports 0 Future consideration

Cyrillic Text not supported when uploaded from a different Country

When creating a Project in North America and having a User in Europe upload Inspections in Cyrillic Text, Cyrillic Text will appear. When a User creates a Project in Europe and a User in North America uploads Inspections in Cyrilic Text, Cyrillic ...
Derryl Acosta over 3 years ago in SYNCHRO Control / Inspection 0 Future consideration

Auto populate Date or Name in forms

User requested that we can create an action to automatically populate the users name or date in forms when filling out the forms.
Thomas Schimpf over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Separate permissions for folder and file creation

Folder Permissions should be separate from allowing a User the Permission to Upload Documents in a Folder. By providing a User Permissions to Read/Write, it appears it allows a User to upload files to a Folder, but will also allow a User to create...
Derryl Acosta over 3 years ago in SYNCHRO Control / Admin 0 Future consideration