Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1302

Calendar view for all forms types

Calendar view of all due dates in "My Work" is great but a similar view for individual form types would be beneficial for users that need to triage work for specific forms types.
Ryan Posnikoff over 1 year ago in SYNCHRO Control / Forms 1 Future consideration

Ability to unlock locked folders by an Admin

A folder can be locked by any Role having corresponding permissions, however, there may be instances when the user is not available to grant access to the files.
Arpit Prakash over 1 year ago in SYNCHRO Control / Documents 0 Future consideration

Physical Quantity distribution in Task Usage

It would be very helpful to see a physical quantity, its cost (or task cost) and their distribution in the "task usage report"
Varvara Kleshchevnikova almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Synchro_Resource Leveling/takt planning

Myself, a synchro user from Germany.I have developed a 4D BIM simulation with concrete quantity forecast in my new project .Now I would like to do a Resource levelling or takt planning.The peak demands needs to be balanced .Is there any solution a...
Guest almost 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

Ability to add custom forms to mobile platform e.g. vehicle prestarts

Utilising custom forms to be able to create prestarts for equipment. Daily prestart checklists varying on type of equipment.
Jake Roduner 9 months ago in Perform / Plant & Equipment Tracking 1 Already exists

Reflect simultaneous activities with different locations in a 4D animation

In road projects where there are different sections and different construction elements in which there are several tasks occurring at the same time in different locations, I would like to reflect simultaneous tasks with different locations in a 4D...
Sergi Ferrater 9 months ago in SYNCHRO 4D Pro / Animations 1

Group Option in Form Designer

Many case, in a form user want to have a group of Check Box, where user only allowed to select one. This requirement is easy with the group option that normally available in the programming lagguage.
Indrawan Wijaya 9 months ago in SYNCHRO Control / Forms 0

Adding point cloud support

It would be nice to have point cloud integration in Synchro, especially for site logistic planning. The google map or Infraworks model seems out of date most of time when we try to plan pump location and truck route in reality.
Guest over 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Mandatory Fields on Events: Event Date and Event Category

Improve the data integrity of Events by making Event Date and Event Category mandatory on the creation of the Event.
Luke Read over 2 years ago in Perform / Events & Notices 2 Future Consideration

Synchro Control auto-emails to a daily or weekly digest

A way to set the Synchro Control auto-emails to a daily or weekly digest, instead of one email every time something happens.
Thomas Schimpf about 3 years ago in SYNCHRO Control / Reports 0 Future consideration