Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

SYNCHRO Control

Showing 774

Manage Project Details [Customizable]

Would like the ability to add Basic or Advanced Controls as in Forms Designer. i.e. Would like a field to be able to put an Owners Project Number / Name
Derryl Acosta over 3 years ago in SYNCHRO Control / Admin 0 Future consideration

Allow bulk update for Plansets sheets

With projects having thousands of sheets added as plan sets. Sometimes it is necessary to update some information on multiple sheets after the sheets are published. For a scenario where, for example, the discipline of 100+ sheets needs to be chang...
Hasham Kiani almost 2 years ago in SYNCHRO Control / Plan Sets 0 Planned

Ability to load multiple projects through Power BI Connector

Currently, I can only load one project at a time - If i want to aggregate data from multiple projects, and I run the Connector, it will create duplicates of the existing tables with a suffix (Query1, Query2, etc.), which becomes very hard to merge...
Arpit Prakash almost 2 years ago in SYNCHRO Control 0 Future consideration

Bigger image view

When images are attached to forms, they show simply as thumbnails. If the image was displayed in a larger size directly in the form, it would quicken the workpace since you wouldn't have to click into the image to see it fully
Guest almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Project Environment Size

Hi SYNCHRO Team, It would be great if I could tell the data size each project environment is currently using. This is so I can allocate the appropriate server space to collect and store the information currently inside, for archival purposes.
Guest almost 2 years ago in SYNCHRO Control / Admin 0 Will not implement

PDF version compare in order to view sheet to sheet or older versions and not just to the current.

Some organizations use sperate existing layout sheet and proposed layout sheet, I want to able to compare the two different sheets. When multiple revision sheets exist for a single sheet, I would like to be able to compare the revisions, i.e. vers...
Kerry Newbanks almost 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Ability expand multi-line input box within a grid for better visibility

Arpit Prakash almost 2 years ago in SYNCHRO Control 1 Planned

Create actions based on multi assign

Multi Assign is bound to 'Assigned Users', but we cannot create actions from that binding. We would like to be able to do so.
Arnar Agustsson almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Permissions based on status in the workflow

It should be possible to define permissions based on status in the workflow. So for example when an issue hits a specific status only certain roles are allowed to modify, while though still being visible to other roles.
Arnar Agustsson almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Merging work packages

we should be able to create work packages from Synchro 4D pro (via Resource Groups) and see them in the list of work packages in Control. At the moment these two lists are not he same. At the same time, the status update should be available in the...
Francesco Nacci almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration