Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

SYNCHRO Control

Showing 757

Allow bulk update for Plansets sheets

With projects having thousands of sheets added as plan sets. Sometimes it is necessary to update some information on multiple sheets after the sheets are published. For a scenario where, for example, the discipline of 100+ sheets needs to be chang...
Hasham Kiani over 2 years ago in SYNCHRO Control / Plan Sets 0 Planned

direct link between individual model elements to drawings in documents

all elements, if configured, should be linked to live documents on Control when user click on one element, it will take to the right drawing within Control. It could be a tag, an url, or simply the name of the document and stored in the section sh...
Shaohua Guan over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Ability to load multiple projects through Power BI Connector

Currently, I can only load one project at a time - If i want to aggregate data from multiple projects, and I run the Connector, it will create duplicates of the existing tables with a suffix (Query1, Query2, etc.), which becomes very hard to merge...
Arpit Prakash over 2 years ago in SYNCHRO Control 0 Future consideration

Documents Count and Selection

Under the documents Module, User would like to see a count of the files that are selected in a folder and a count of documents under that folder
Derryl Acosta over 4 years ago in SYNCHRO Control / Documents 0 Already exists

Project Environment Size

Hi SYNCHRO Team, It would be great if I could tell the data size each project environment is currently using. This is so I can allocate the appropriate server space to collect and store the information currently inside, for archival purposes.
Guest over 2 years ago in SYNCHRO Control / Admin 0 Will not implement

PDF version compare in order to view sheet to sheet or older versions and not just to the current.

Some organizations use sperate existing layout sheet and proposed layout sheet, I want to able to compare the two different sheets. When multiple revision sheets exist for a single sheet, I would like to be able to compare the revisions, i.e. vers...
Kerry Newbanks over 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Ability expand multi-line input box within a grid for better visibility

Arpit Prakash over 2 years ago in SYNCHRO Control 1 Planned

Create actions based on multi assign

Multi Assign is bound to 'Assigned Users', but we cannot create actions from that binding. We would like to be able to do so.
Arnar Agustsson over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Permissions based on status in the workflow

It should be possible to define permissions based on status in the workflow. So for example when an issue hits a specific status only certain roles are allowed to modify, while though still being visible to other roles.
Arnar Agustsson over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

See Cost Codes in Control

Want to see Cost Codes assinged in Modeler in Control on the elements
Dan Sheldon over 4 years ago in SYNCHRO Control / Models 0 Future consideration