Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

SYNCHRO Control

Showing 765

Manage iModel connections UI in Synchro control

I would like the feature to select all imodel and change the sync schedule timing or while changing the schedule for each model the options should stick in one place when scrolling down to select the models.
Jerry David Jaypaul almost 3 years ago in SYNCHRO Control 0 Future consideration

Drag windows out of the way in Manage iModel

During the process of managing an iModel there are various windows that come up. Please could you add functionality for dragging these windows to a different position? For example to another computer screen. They are currently static and it would ...
Ruth Fuller over 1 year ago in SYNCHRO Control / Models 0 Planned

Edit form access

Add 'Edit Form' access to Role management.
Guest about 4 years ago in SYNCHRO Control / Forms 2 Will not implement

I want to use an Action to create a message in a Form to tell a User to do something without the "Basic HTML alert" popping up in the title of the message.

I want to use an Action to create a message in a Form to tell a User to do something without the "Basic HTML alert" popping up in the title of the message. The Message on the first line: “Construction.bentley.com Says” is meaningless to a message ...
David Dudek Jr. over 1 year ago in SYNCHRO Control / Forms 2 Will not implement

Ability to change style in script

Adding ability to format a control -> change style-> choose style would add further capabilities as implementing RAG type notifications or changing colours of not only box (highlight) but control font properties too (changing from white font...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 1

Allow bulk update for Plansets sheets

With projects having thousands of sheets added as plan sets. Sometimes it is necessary to update some information on multiple sheets after the sheets are published. For a scenario where, for example, the discipline of 100+ sheets needs to be chang...
Hasham Kiani over 1 year ago in SYNCHRO Control / Plan Sets 0 Planned

SYNCHRO Field - Summary View

Summary of Un-Synched and Synched items on the Field App Having a Summary of a Users Work Summary and a Users Own Work / Project that shows New,Overdue,Close deadline, etc.
Derryl Acosta over 4 years ago in SYNCHRO Control / Reports 0 Future consideration

Drag n Drop revisioning in PDF plan sets

If the user could drag an uploaded sheet on top of the existing published sheet icon in the left nav bar to revision it. It would save the user from having to manually lenter the sheet # in order to initiate the revision process
Guest over 4 years ago in SYNCHRO Control 0 Future consideration

Ability to load multiple projects through Power BI Connector

Currently, I can only load one project at a time - If i want to aggregate data from multiple projects, and I run the Connector, it will create duplicates of the existing tables with a suffix (Query1, Query2, etc.), which becomes very hard to merge...
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Future consideration

Synchro Control footnotes and annotation

My team are currently using 4D pro to create our 4D models. However, the various disciplines within the design team cannot view the model as they do not have Synchro software on their laptops. I noticed Synchro viewer is an option however this sof...
Marc Jaikaran almost 3 years ago in SYNCHRO Control 1 Future consideration