I would like the feature to select all imodel and change the sync schedule timing or while changing the schedule for each model the options should stick in one place when scrolling down to select the models.
Jerry David Jaypaul
almost 3 years ago
in SYNCHRO Control
0
Future consideration
in the same way that we control the permissions for a role for the whole form, we need to be able to define permissions at state level. This means that UserA has all up to Assign permissions on the form, this automatically is inherited in Status A...
During the process of managing an iModel there are various windows that come up. Please could you add functionality for dragging these windows to a different position? For example to another computer screen. They are currently static and it would ...
Summary of Un-Synched and Synched items on the Field App Having a Summary of a Users Work Summary and a Users Own Work / Project that shows New,Overdue,Close deadline, etc.
If the user could drag an uploaded sheet on top of the existing published sheet icon in the left nav bar to revision it. It would save the user from having to manually lenter the sheet # in order to initiate the revision process
Guest
over 4 years ago
in SYNCHRO Control
0
Future consideration
I want to use an Action to create a message in a Form to tell a User to do something without the "Basic HTML alert" popping up in the title of the message.
I want to use an Action to create a message in a Form to tell a User to do something without the "Basic HTML alert" popping up in the title of the message. The Message on the first line: “Construction.bentley.com Says” is meaningless to a message ...
Adding ability to format a control -> change style-> choose style would add further capabilities as implementing RAG type notifications or changing colours of not only box (highlight) but control font properties too (changing from white font...
My team are currently using 4D pro to create our 4D models. However, the various disciplines within the design team cannot view the model as they do not have Synchro software on their laptops. I noticed Synchro viewer is an option however this sof...
Marc Jaikaran
almost 3 years ago
in SYNCHRO Control
1
Future consideration
With projects having thousands of sheets added as plan sets. Sometimes it is necessary to update some information on multiple sheets after the sheets are published. For a scenario where, for example, the discipline of 100+ sheets needs to be chang...