Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

SYNCHRO Control

Showing 766

Ability to change style in script

Adding ability to format a control -> change style-> choose style would add further capabilities as implementing RAG type notifications or changing colours of not only box (highlight) but control font properties too (changing from white font...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 1

Form Services - Ability to mass Delete items when a CSV is uploaded

When uploading a CSV File, a User does not have the ability to select multiple items to DELETE. A User will need to DELETE each individual line entry one by one. Should have the option to select multiple items. If an Item has been used in a Form D...
Derryl Acosta over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

View PDF view when creating a Custom Printout without having to create a FORM

I would like to be able to view a PDF view of a Custom Printout in Draft mode without having to Publish and then actually create an active Form.
David Dudek Jr. over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Allow bulk update for Plansets sheets

With projects having thousands of sheets added as plan sets. Sometimes it is necessary to update some information on multiple sheets after the sheets are published. For a scenario where, for example, the discipline of 100+ sheets needs to be chang...
Guest over 1 year ago in SYNCHRO Control / Plan Sets 0 Planned

Manage iModel connections UI in Synchro control

I would like the feature to select all imodel and change the sync schedule timing or while changing the schedule for each model the options should stick in one place when scrolling down to select the models.
Jerry David Jaypaul over 2 years ago in SYNCHRO Control 0 Future consideration

Ability to load multiple projects through Power BI Connector

Currently, I can only load one project at a time - If i want to aggregate data from multiple projects, and I run the Connector, it will create duplicates of the existing tables with a suffix (Query1, Query2, etc.), which becomes very hard to merge...
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Future consideration

Manage emails

Contractors/.CMs want to be able to link emails within their construction doc management and controls systems. This could include simple drag and drop of emails in Outlook into Bentley Project Management system to be managed as discrete doc or att...
Rich Humphrey over 5 years ago in SYNCHRO Control / Documents 0 Future consideration

Project Environment Size

Hi SYNCHRO Team, It would be great if I could tell the data size each project environment is currently using. This is so I can allocate the appropriate server space to collect and store the information currently inside, for archival purposes.
Guest over 1 year ago in SYNCHRO Control / Admin 0 Will not implement

PDF version compare in order to view sheet to sheet or older versions and not just to the current.

Some organizations use sperate existing layout sheet and proposed layout sheet, I want to able to compare the two different sheets. When multiple revision sheets exist for a single sheet, I would like to be able to compare the revisions, i.e. vers...
Kerry Newbanks over 1 year ago in SYNCHRO Control / Plan Sets 0 Future consideration

Ability expand multi-line input box within a grid for better visibility

Arpit Prakash over 1 year ago in SYNCHRO Control 1 Planned