Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1337

Adding Tag

When adding tag, we do not seems to have a list of existing tags. Request is to list all the existing tags as we enter a string. Also be able to have a hierarchy tag If we could introduce TAG IA so by doing OCR, tags could be propose and accept by...
Luc Poulin 11 months ago in SYNCHRO Control / Documents 0

Control access to sheet under plan set

It does not seem we can control access to sheet in a plan set. Under Documents we can set folder access Under Connections access is control by PWDI We would require the same access control for sheet under plan set.
Luc Poulin 11 months ago in SYNCHRO Control / Plan Sets 0

Locate on Map

For vertical building and large building ( stadium) we will require to have a multi layer map ( one per floor or elevation). Also we need to create a custom map that would represent a section of a building at a specific elevation has we the constr...
Luc Poulin 11 months ago in SYNCHRO Control / Plan Sets 0

Audience for comment

From the pdf Settings, we can add a comment to a pDF How ever we cannot set the audience for the comment it will be visible to all users. Same if we annotate a PDF from the markup. Request is to allow comment creator to set the audience for a comm...
Luc Poulin 11 months ago in SYNCHRO Control / PDF Markup 0

Synchro_Resource Leveling/takt planning

Myself, a synchro user from Germany.I have developed a 4D BIM simulation with concrete quantity forecast in my new project .Now I would like to do a Resource levelling or takt planning.The peak demands needs to be balanced .Is there any solution a...
Guest over 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Future consideration

Undo feature (not rollback)

There is a lack of an "Undo" feature. In P6 we are able to go back if something was keyed in incorrectly. A rollback is not always practical. We would like the application to allow for 1-3 user undo requests.
Jason Summers over 3 years ago in SYNCHRO 4D Pro 0 Will not implement

PDF setting and Work Package

A link should exist between PDF being imported under PDF Setting and any Work Package we create ( Forms for example....... or a dedicate environment to create and manage work package) An imported pdf can be associate to multiple work package. As s...
Luc Poulin 11 months ago in SYNCHRO Control / Admin 0

New sheet version

When create a new version of a sheet from PDF Setting. We need to match a page# and a discipline to be able to select the previous version. In large building, our criteria are more: Location, Sub-Location, Area, sib-Area then then discipline etc.....
Luc Poulin 11 months ago in SYNCHRO Control / Admin 0

Allow filter and search under download

Since we can download in batch multiple folders or documents. We will require to have search and filter capabilities under the download section
Luc Poulin 11 months ago in Field / Documents 2 Future Consideration

Hide previous version under Connection

In the vatical ellipse menu ( vertical three dots top right) add the option to hide previous version. (I suspect that version will find their way to Documents as well so same will need to be deploy when versions are available under documents) In t...
Luc Poulin 11 months ago in Field / Documents | Connections 1 Planned