Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1284

provide capability for user selectable date/time binding to have same functionality as DueDate

As a user i would like to have the ability to track more than one date in a form. My need at the moment is where I have a calibration register. Each form is a record for an instrument. The instrument has a calibration expiry (used DueDate) as well...
Kiril Tasev 8 months ago in SYNCHRO Control / Forms 0

Additional Functionality on Projects Page

The ability to Group Projects on the Home Page by adding some additional fields such as Location, Phase, and Date. Would also like the ability to create Custom sort/groups for Projects.
Derryl Acosta about 3 years ago in SYNCHRO Control / Admin 0 Future consideration

Ability to automatically fill Plan Set fields from title block

All sheets within a plan set typically have a title block with consistent data structure and location. We can already select text from a smart pdf, or ocr capabilities for dumb pdfs. We should be able to map this information to their respective fi...
Arpit Prakash over 1 year ago in SYNCHRO Control / Plan Sets 0 Future consideration

Automatically add Map location when adding a geolocated Model location on a Form

Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Ability to see Saved Searches when creating an iModel Connection from PW

This should be in sync with what we see through PW connection in documents.
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Planned

Transmittals or submittal

Can submittals and transmittals be generated from a Control Project? Either from within or via ProjectWise?
Guest almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Support for IFC 4 and 4x1

I work with linear Projects. Trains, Roads, Bridges. Most of these Software have recently added IFC support, but only for the schema 4x1 because it's the only one that supports alignments. Please, add it. It's very painful to go back to dwg just b...
Guest over 4 years ago in SYNCHRO 4D Pro / Integrations 1 Future consideration

Adding Contingency Transfer to Contracts module in SYNCHRO Control

Users from Lee County find the contingency transfer feature from EADOC really useful to be added to the current SYNCHRO Control - Contracts module
Shaohua Guan 8 months ago in Contracts 0

See source of model and Ability to remove model from iModel viewer

Using the iModel viewer in the browser gives a list of different models. It doesn't show however where these models come from. It would be useful to see that (when hovering or in the properties ...) At the same time it would be useful to have the ...
Johan De Cock 8 months ago in SYNCHRO Control / Models 0 Future consideration

Get overview of "local" connectors from within the cloud environment

I sometimes use the iTwin Synchroniser from my desktop to directly synchronize models from a local source to the iModel. This means I don't have to first upload them, makes it also easier to deal with versioning. Unfortunately outside of the local...
Johan De Cock 8 months ago in SYNCHRO Control / Models 0