Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

SYNCHRO Field

Showing 109

Button in email that redirects directly to Synchro Field

When you receive an email, you only have a button that sends you to Synchro Control. We should have the option to redirect to the application directly.
Yessica Andrade Barbosa about 1 year ago in SYNCHRO Field / Forms | Forms 0 Future Consideration

Ability to read a QR/bar code in forms

Ability to read a QR/bar code in forms and use the infrmation for: populating a textbox/numberbox link to documents/data n SYnchro/alim/PW compare the data to a data linked from ALIM e.g. asset numbers
Kiril Tasev about 1 year ago in SYNCHRO Field / Forms | Forms 0

Place the attachments in a PW folder

Each time attachments are added to a form, they should be saved directly to a specific folder in the project.
Yessica Andrade Barbosa about 1 year ago in SYNCHRO Field / Documents | Connections 0

Can progress be performed without 3D

For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
Derryl Acosta over 4 years ago in SYNCHRO Field / Status update | Tasks 1 Planned

QR and other codes scanning

Please, provide option to scan QR, data matrix and other codes in Field and Control. Allow the result as a decoded text to be populated and used in a control i.e. to read bu user, compare to another value in a different field or as a link to follo...
Kiril Tasev 8 months ago in SYNCHRO Field / Forms | Forms 0

Can Due Date on form be defaulted to TODAY()+X number of days?

By default can the due date be "X" number of days from the date the form was created?
Dan Sheldon over 2 years ago in SYNCHRO Field / Forms | Forms 1 Will not implement

Resource Status - Update percentage base of quantity

If a task is planned for 10 days to pour 100 cubic meters of concrete. The user would like to be able to update the quantity (cubic meters) using the Field app - Status update
Paolomee Udani about 4 years ago in SYNCHRO Field / Status update | Resources 0 Planned

Reality data in Synchro Field app

It would be a great use case if engineers can view the reality data photogrammetry in the Synchro Field app similar to Synchro Control
Janaki Sundaram over 1 year ago in SYNCHRO Field / Models | Views 0 Future Consideration

Ability to re-assign/copy forms

This is possible in Control, but not in Field.
Arpit Prakash over 1 year ago in SYNCHRO Field / Forms | Forms / Forms | Inspections 0 Future Consideration

Collaboration Tracking in Forms

Should be a feature in Forms that allows us to know if another person has a meeting draft open, for example or is opening a form at the same time
Joana Isabel Neves Gomes 10 months ago in SYNCHRO Field / Forms | Forms 0