Have the capability to setup the default location for the QR code stamp in plan set module. Also have the capability to stamp all Plan sets at one time or selected range, draft or published status, etc.
View Control on multiple Monitors to improve workflows and clarity
Similar to how designers and split their desktop products onto multiple monitors, can we have this same functionality within Bentley web-based products. An example would be, I would prefer to see the Schedule Gantt Chart and details in one window,...
To prevent users from accidentally deleting the wrong attachments, it would be good to add more details to the delete dialog that pops up. Currently, it just asks the users whether they want to delete the attachment, without an indication to show ...
Arnar Agustsson
almost 2 years ago
in SYNCHRO Control
1
Future consideration
the goal is to filter the 4D view to today's or next week's work for the specific role based user viewing the 4D model, pref. based on activity codes, 3D or tasks filters (like SITE used to have!)
Showing all active Resources for a look ahead period
I am trying to generate look ahead prints with all active 3D resources visible for that look ahead period instead of just the active Resources of the Focus Time. Example: show all tasks in between 25th of July '22 and 21st of August '22.I would li...
As a user configuring inspections, I'd like the ability to download the inspection configuration file .xlsx I have previously loaded into SYNCHRO Control. This is so that I can correct mistakes, add more to the WBS/Spec, etc.
Any user configuring inspections will benefit from this as it allows to correct mistakes. Additionally, if the user making the adjustments is not the same as the user making the original configuration then this new user can go to SYNCHRO Control t...
Mariano Colicchio
almost 2 years ago
in SYNCHRO Control
0
Planned
To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.
For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control
1
Future consideration
To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.
As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control / Models
1
Future consideration