Provide option to limit which admins can see projects in Synchro Control
Currently if a user has a role of admin he can see any project set up on Synchro. Please, provide option to limit which admins can see/edit/modify my projects.
Provide option to see project owners/creator in Synchro Control Projects screen
Provide option to see project owners/creator in Synchro Control Projects screen. Currently this is not possible from the main register, and I have to click into teh projec to see details.
Kiril Tasev
about 1 year ago
in SYNCHRO Control
0
Future consideration
It should be possible to set conditions that trigger certain permissions. As an example, a sub-contractor could have different permissions based on the discipline of the form that is being raised. The electrical sub might be a direct participant i...
Arnar Agustsson
about 1 year ago
in SYNCHRO Control / Forms
0
Future consideration
Automatically add the user's role to the multi-assign for forms with IsPrivate enabled
When the IsPrivate binding is enabled on a form, it can be tricky to ensure that all relevant users have access. The creator always gets access but others need to be added manually. This can be partially done with scripting but there is still a ke...
Arnar Agustsson
about 1 year ago
in SYNCHRO Control / Forms
0
Future consideration
Display list of Projects in CONNECT Portal with icons
Differentiating between ProjectWise; Synchro and portentially other project types in the https://connect.bentley.com/SelectProject/Index interface causes confusion. Being able to see or select project types based on the Cloud Service they utilise ...
TxDOT would like to be able to have superintendents capture live signatures from contractors or law enforcement officers on forms. The contractors/law enforcement officers will not have access to Synchro. Hence, TxDOT would like officers to be abl...
Let user tag sheets in PDF plan set using a bulk upload via spreadsheet
would it be possible to develop a feature to tag (add detailed information like name, sheet number, discipline, type, revision, revision date, etc.) sheets in the PDF plan set via a spreadsheet upload?
Transfer iModel and related data from Project Wise to Control
To be able to transfer an IModel that has been linked on ProjectWise to a Control Project without loosing ALL Connections that were made in 4D Pro and/or Modeler
Please, make that the style is not inherited by controls inserted within other controls. - CS0115180
Technically this should be classed as bug. When inserting styled controls in a region, the child controls are inheriting the style definition of the parent Region. This causes confusion and the way around is to go and edit the style of the child c...