PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1284

Add Responsible Company Filter to Work Inspector

Add Responsible Company Filter to Work Inspector. This has been requested by McDermott Project Controls.
Duncan Turner over 1 year ago in Perform / Performance Management 1 Future Consideration

Can progress be performed without 3D

For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
Derryl Acosta over 3 years ago in Field / Status update | Tasks 1 Planned

more task filters options

Currently you can filter with a time frame and the 3d view will adapt to it. user should be able to filter by human resource, material resource, equipment resource, and location resource. user should also be able to filter by work package descipli...
Shaohua Guan almost 4 years ago in SYNCHRO Control / Models 0 Future consideration

Import Appearance profile assignments from Excel

Hello! It will be very usefull to be able to export / import to / from Excel an Appearance profile assignments on Resource assignments worksheet.
Igor Saenko almost 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Custom Forms - Mass fill bindings with excel import/export

Instead of having to select and create bindings on each control in the form designer. It would save allot of time if there was an export with all the controls and bindings, where we could mas assign binding and import back into SYNCHRO Control
Thomas Schimpf almost 3 years ago in SYNCHRO Control / Forms 0 Future consideration

PDF Output for Number Thousand Separator

Fot the PDF Custom Design Print out, user need to show the amount with thousand separator. Please check the snapshot.
Indrawan Wijaya 6 months ago in SYNCHRO Control / Forms 0

Wrap Text for Activity Name

We have very Detailed activity names, and even after Reducing the Task Indent Space reading activity name is still difficult. If we expand the Activity name column then the Activity Start and Finish date will disappear behind the Gantt. Wrap text ...
Sagar Soni over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Assign by Query

When we create the Json File for the Query. If there is any group that do not contains components, the query does not run. We need to delete those groups. It is good if the assignment still run like normal, only ignore the empty group. Please see ...
Indrawan Gmail about 2 years ago in SYNCHRO Modeler 0 Needs review

Reality data in Synchro Field app

It would be a great use case if engineers can view the reality data photogrammetry in the Synchro Field app similar to Synchro Control
Janaki Sundaram 6 months ago in Field / Models | Views 0 Future Consideration

Custom PDF Design - Paper size

Hi, We have user that need the PDF export in landscape orientation. Right now the PDF export always give Portrait format. Please add the setting to get the Landscape format. and also it is good if we can set the PDF size, like A4, A3, A1 etc. Rega...
Indrawan Wijaya 6 months ago in SYNCHRO Control / Forms 0