Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1323

Ability to save Civil Tools Views

Users want to be able to save profile/cross-section views, with any visible measured dimensions. We should be able to save it to local drive/documents/included in saved views. The use case is to share the information and also attach to Forms. Curr...
Arpit Prakash about 4 years ago in SYNCHRO Control / Models 0 Future consideration

Support for 3D Connexion mouse

No description provided
Guest over 5 years ago in SYNCHRO 4D Pro / Integrations / SYNCHRO Open Viewer 3 Future consideration

User list indexing

We currently have a Microsoft dynamic active directory to manage the user list, we would like to have this list of users available in synchro forms to allow certain forms to select users in this dynamic list. As well we should be able to type a fe...
Dillon Shepherd 8 months ago in SYNCHRO Control / Forms 0

Allowing Decimal "Min Values" and "Max Values" in Decimal Numberbox

When using a decimal Number box field (on Field or on Control), I'm not able to insert a decimal "min" or "max" value, as you can see from the image I attached. The warning that appears says that is required for the value to be a "non-decimal numb...
Miguel Meninas 8 months ago in SYNCHRO Control 0

Option to wrap text within the task table

Option to wrap text within the task table to prevent truncated data in the view.
Jason Summers over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Create a Form within a Form

Forms Manager being able to create a Form within a Form. For example; offering the functionality to directly create a punchlist from an Inspection if there's a deviation / breakage / nonconformance; the user can create a Punchlist without having t...
Guest about 4 years ago in SYNCHRO Control / Forms 0 Future consideration

To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.

For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas over 3 years ago in SYNCHRO Control 1 Future consideration

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Future consideration

Add ability to control the display order of all models including design models and existing reality data.

It would be really helpful if there was a simplistic way to easily control the "Display Order" of the different design models and reality data. For example, if you have a large design excavation model, it will always display below the existing gro...
Aaron McLean 8 months ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0

Test idea to see where it goes

No description provided
Kevin Vivien 8 months ago in SYNCHRO Control / Forms 0