PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1303

Bulk Edit Open Form

We like the use of forms to manage temporary construction assets such as Traffic Control Devices and Stormwater Management. These items require daily to weekly maintenance. In order to show inspection happened on a project wide basis, bulk editing...
Andrew Pangallo about 1 month ago in SYNCHRO Control / Forms 0

Ability to download a previously uploaded cost code excel sheet.

if you have a user who originally created a cost code excel spreadsheet upload, and they leave the company, we have no way to download and/or update the cost code structure without a version of the file. Currently you need the original spreadsheet...
Corey Johnson 2 months ago in SYNCHRO Modeler 0 Needs review

User History in Resources Status from SYNCHRO Field

When working with SYNCHRO Field, multiple users can update Resources Statuses from the field. Subsequently, all updates that these users make are visible in the Resources Properties > Status > History window of SYNCHRO 4D Pro. However, only ...
Jean Delgadillo over 1 year ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

Ability to manually save changes in Forms Designer

When designing large Forms, the performance heavily degrades on any action like selection, editing, etc, due to auto-save continuously running in the background. This could be a toggle to enable/disable as required.
Arpit Prakash 6 months ago in SYNCHRO Control / Forms 0

Supply Chain Implementation

Add in the full bidding cycle into Synchro, add in the following: Pre-Bid - Bid invitations, Invitations to Bid, Custom Bid Forms(Cost and Schedule), Add Deliverables Management or ProjectWise direct connection for drawings/spec upload Bidding - S...
Guest about 2 years ago in Contracts 2 Planned

Ability to bulk create Actions/Scripts through Excel Configuration Spreadsheet

No description provided
Arpit Prakash 8 months ago in SYNCHRO Control / Forms / Inspection 0 Planned

Collaboration Tracking in Forms

Should be a feature in Forms that allows us to know if another person has a meeting draft open, for example or is opening a form at the same time
Joana Isabel Neves Gomes about 1 month ago in Field / Forms | Forms 0

Custom Personal Dashboard can save selected Form Name

Currently the Custom Personal Dashboard can not save the selected Form Name. Beacuse the of that, only few columns are visible in dash board table, because I believe it just show the common columns that are exist in all forms. If we deselect un-wa...
Indrawan Wijaya about 1 month ago in SYNCHRO Control / Reports 0

Add scheduling services to composite iModels

Add scheduling services to composite iModels to create 4D models.
Kevin Vivien 7 months ago in SYNCHRO Control / Models 0

Contractor RFI Usage

It would be ideal be able to select the contract package and RFI is associated with. IE: SC01 - Civil Site, SC02 - Foundations, SC03 - Electrical, and on the RFI number it could be auto numbered as RFI-SC01-0001, RFI-SC02-0001. Allowing Contractor...
Guest about 2 years ago in SYNCHRO Control / Admin 0 Future consideration