[07] Progressing Task

Need to able give progress on task level in the Field App.
Guest about 3 years ago in SYNCHRO Field / Status update | Tasks 0 Planned

Allow user to view SYNCHRO 4D Pro's user fields and SYNCHRO Modeler's cost code

Would be great to be able to see some more construction-relevant information in the field with the model viewer.
Johannes Yu 5 months ago in SYNCHRO Field / Models | Display 1 Future Consideration

A model viewer interface that shows both 3D-task assignment and 3D element properties

In Model interface, we are able to see element properties, but unable to see tasks (and the associated 3D resource assignment); whereas in the Status Update interface, we can see 3D-task assignment but cannot see 3D element properties. Would be gr...
Johannes Yu 5 months ago in SYNCHRO Field / Models 1 Future Consideration

Default View for Imodel matching Control Default View

Within control you have the ability to create a saved view and make it default. When opening the same imodel within the field application as of this time it doesn't load into the default imodel like it does within the control application. I would ...
Ryan Bilger 5 months ago in SYNCHRO Field / Models | Display 0 Future Consideration

When selecting multiple elements in the model add their quantities together

When selecting multiple elements in the model add there quantities together rather than returning "Varies" If I select two runs of curb and gutter the first being 150ft long and the second being 198ft long I want to get 348ft of curb and gutter in...
Dan Sheldon over 1 year ago in SYNCHRO Field / Models | Display 0 Future Consideration

Profile Window - Show Multiple Alignments

We often have multiple vertical alignments for a single horizontal alignment. It would be extremely helpful to see all vertical alignments in the profile window. Currently, if we have a roadway profile that is not set active because there are mult...
Ariel Froerer 10 months ago in SYNCHRO Field / Models | Tools 1 Future Consideration

Can progress be performed without 3D

For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
Derryl Acosta about 3 years ago in SYNCHRO Field / Status update | Tasks 1 Planned

Resource Status - Update percentage base of quantity

If a task is planned for 10 days to pour 100 cubic meters of concrete. The user would like to be able to update the quantity (cubic meters) using the Field app - Status update
Paolomee Udani almost 3 years ago in SYNCHRO Field / Status update | Resources 0 Planned

Project filtering by filters or activity codes

the goal is to filter the 4D view to today's or next week's work for the specific role based user viewing the 4D model, pref. based on activity codes, 3D or tasks filters (like SITE used to have!)
Joost Wijnen almost 3 years ago in SYNCHRO Field / Models | Display 0 Future Consideration

Change Selection Method

Model Viewer - Provide the option for users to change their Element Selection method from cumulative (each new element selected is added to the current selection) to a single-element select where tapping a new element creates a new selection.
Ariel Froerer about 1 year ago in SYNCHRO Field / Models | Display 1 Future Consideration