Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule
Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro.
These layouts must include :
- Schedule Tasks Group and Sort,
- Schedules tasks filters,
- Relevant Schedule Tasks Attrib...
users and project team have feedback that SYNCHRO Control iModel navigation is laggy and slow. please look into the matter so that the model can orbit and rotate smoother and faster.
Email notifications showing mis-leading information
Ability to change the basic email notification sent out. Currently the email notification includes info like Created by and Created on, which COUNTERINTUITIVELY tells the user who has DESIGNED this form and WHEN IT WAS DESINGED.. instead of showin...
Having a connection to ProjectWise is good, but consulting organizations use multiple document systems. To simplify workflows for consulting organizations with multiple documents sources working with owner/operators, contractors, other consultants...
Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro
In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Add the schedule visualization to users with Guest role
For Guest users who visualize the animation the capability of seeing the running schedule would make easier the understanding of what is developing on screen
This is useful for cases where we want to make a field hidden by default, but it becomes visible and required based upon other related input. We can make fields required through workflow, but that is not available through initialization settings.