1. Allow Project Admins/Project Owners/Document Controller to Delete Forms created in error in progress 2. Allow admins to download a list of all Bindings. 3. Delete Binding Created by Administrator4. Have a separate Test Area in Control, within t...
See source of model and Ability to remove model from iModel viewer
Using the iModel viewer in the browser gives a list of different models. It doesn't show however where these models come from. It would be useful to see that (when hovering or in the properties ...) At the same time it would be useful to have the ...
Get overview of "local" connectors from within the cloud environment
I sometimes use the iTwin Synchroniser from my desktop to directly synchronize models from a local source to the iModel. This means I don't have to first upload them, makes it also easier to deal with versioning. Unfortunately outside of the local...
I often have models or drawings that are not created in the same (/correct) local coordinate system. In Microstation application it is possible to assign GCS to those different files and then reference them with "GCS reprojection". Meaning that th...
Currently, the system binding Assigned to is able to be used to populate user lists using scrips, but not the other way around. By allowing the user lists to populate this system binding we can automate workflows and reduce the manual work for use...
Currently, system bindings only include Assigned to and Assigned users. To simplify script configurations and allow for more automated workflows, there is a need to include more. Created by - This would allow a script or a workflow transition to s...
Calendar view of all due dates in "My Work" is great but a similar view for individual form types would be beneficial for users that need to triage work for specific forms types.
Ryan Posnikoff
over 1 year ago
in SYNCHRO Control / Forms
1
Future consideration
A folder can be locked by any Role having corresponding permissions, however, there may be instances when the user is not available to grant access to the files.
Currently the workflow requires a download from the source (PW or project documents) and an upload to plan set. That leaves up to 3 copies of the same file.