Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1323

Archive of information from SYNCHRO Control

To create an Archive/Backup of the data in Control for a client
Derryl Acosta over 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Bulk Process Function for Invoices

We would like to be able to change Invoice status from RECEIVED to PROCESSED in bulk through box selection similar to other pages in SYNCHRO Perform.
Ernest Downes 7 months ago in Perform / Dockets 0

Bulk Assign function for Purchase Orders

Add a Bulk Assign function for Purchase Orders to the All-Dockets webpage for SYNCHRO Perform similar to current Assign functionality for Invoice Assignment
Ernest Downes 7 months ago in Perform / Dockets 0

Ability to Edit while reviewing Roles in the side panel

No description provided
Arpit Prakash 7 months ago in SYNCHRO Control / Admin 0

more task filters options

Currently you can filter with a time frame and the 3d view will adapt to it. user should be able to filter by human resource, material resource, equipment resource, and location resource. user should also be able to filter by work package descipli...
Shaohua Guan over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Import Appearance profile assignments from Excel

Hello! It will be very usefull to be able to export / import to / from Excel an Appearance profile assignments on Resource assignments worksheet.
Igor Saenko over 4 years ago in SYNCHRO 4D Pro 0 Future consideration

When selecting multiple elements in the model add their quantities together

When selecting multiple elements in the model add there quantities together rather than returning "Varies" If I select two runs of curb and gutter the first being 150ft long and the second being 198ft long I want to get 348ft of curb and gutter in...
Dan Sheldon over 2 years ago in Field / Models | Display 0 Future Consideration

PDF geolocation by level for building

When using Synchro for a large building construction, we would like to have the possibility to along with the geolocation (X,Y) add the height to represent the different floor of the building. This will be important as some PDF will share the same...
Luc Poulin about 1 year ago in SYNCHRO Control / Plan Sets 0

Ability to download csv upload template file

We have had and will have a few cases coming up where we would like to download the instances that are currently in a form and then be able to upload it into a duplicate form in another project. Currently, we are able to download the blank csv “te...
Charlie Button 7 months ago in SYNCHRO Control / Admin 0

We want to be able to run a report which could create an "Audit Trail" by User ID.

In SYNCHRO control would like to have an option to run a report which would create an "Audit Trail" by user ID or task. Almost like a key stroke report. There are times when our users are working on multiple functions in SYNCHRO and at the same po...
David Dudek Jr. over 2 years ago in SYNCHRO Control / Admin 0 Future consideration