Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1309

Ability to filter/select PDF settings plan sheets by user defined tags.

In the PDF Settings selection under administration in SYNCHRO control we only have the ability to filter by all sheets, published or draft. A document controller needs the ability to have more options available to view plan sheets in case modifica...
David Gallaher almost 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Exported 4D synchro .fbx format when linked with 3ds max file texturing is not possible

Our Team is working on one project and our scope is to export 3D model from synchro as .fbx file and link that file into 3ds max to create rendering according to the planned dates from schedule because we need to update that file multiple times as...
Trishi Ashware almost 2 years ago in SYNCHRO 4D Pro / Import/Export 1

Cancel Button not intuitive

On SYNCHRO Control, when you have a form open and you want to close it, you have to click "cancel" to exit the form. This is not intuitive, because it looks you are canceling the form (in other words, it looks you are erasing all the information)....
Miguel Meninas 6 months ago in SYNCHRO Control / Forms 0

Ability to re-assign/copy forms

This is possible in Control, but not in Field.
Arpit Prakash 12 months ago in Field / Forms | Forms / Forms | Inspections 0 Future Consideration

When creating a workflow and deciding which Properties should be Enabled or Disabled based on workflow status, we only want to see the bindings associated to the form we are working on, not all Bindings in Control. This can be confusing.

When deciding which bindings so be enabled or disabled within a workflow it would be helpful to see on the bindings associated to the form we are working with. Right we have a view of all bindings.
David Dudek Jr. almost 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Can Due Date on form be defaulted to TODAY()+X number of days?

By default can the due date be "X" number of days from the date the form was created?
Dan Sheldon almost 2 years ago in Field / Forms | Forms 1 Will not implement

The Map Layers doesn't support weather

Would like to be able to see Radar and other map-related weather items as you can see in the Map view in Control. This is needed to attach to forms to show why a delay may have happened
Dan Sheldon almost 2 years ago in Field / Forms | Forms 0 Future Consideration

Add support for BCF

https://en.wikipedia.org/wiki/BIM_Collaboration_Format
over 5 years ago in SYNCHRO 4D Pro / Integrations / SYNCHRO Open Viewer 3 Future consideration

% Complete calculated consistenly with Physical Quantities

In SYNCHRO, despite is possible to calculate progress of leaf activites through Physical Quantitities, their "father" activities are still calculated by Duration (as their children progress is calculated by Automatic/Duration). % Complete of non-l...
Gabriele Barone 12 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Likely to implement

Delete or reassign multiple costs at one time

Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher almost 2 years ago in SYNCHRO Modeler 0 Future consideration