ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1302

Ability to filter/select PDF settings plan sheets by user defined tags.

In the PDF Settings selection under administration in SYNCHRO control we only have the ability to filter by all sheets, published or draft. A document controller needs the ability to have more options available to view plan sheets in case modifica...
David Gallaher over 1 year ago in SYNCHRO Control / Plan Sets 0 Future consideration

Exported 4D synchro .fbx format when linked with 3ds max file texturing is not possible

Our Team is working on one project and our scope is to export 3D model from synchro as .fbx file and link that file into 3ds max to create rendering according to the planned dates from schedule because we need to update that file multiple times as...
Trishi Ashware over 1 year ago in SYNCHRO 4D Pro / Import/Export 1

Transition Button - Able to Notify user from Binding Property

Hi, Right now in Transition button we have the Notification User. But the list is limited to User List. It is good if we can notify to user using the Binding / Property. Example: Notify the user who did the Inspection (using binding : Inspected by...
Indrawan Wijaya 5 months ago in SYNCHRO Control / Forms 0

Shared With in Script

The Shared With is not shown in the Script if we are using both (Assigned to and Shared With) What is the reason Shared With is not appear?
Indrawan Wijaya 5 months ago in SYNCHRO Control / Forms 0

Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.

Currently in synchro Control \ Schedule the animation is starting at the Project Start Date. Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas almost 3 years ago in SYNCHRO Control 1 Future consideration

Ability to change status of more than one form at a time

Having to manually turn each form from published to draft just takes too long
Guest over 3 years ago in SYNCHRO Control / Forms 2 Future consideration

Improve naming of split objects created by Modeler

Currently names of the 3d objects are not informational and cause inconvenience for distinguishing them. Instead of naming all of them WorkAreaDetailingElement, it may be better to name this split objects by concatenating the inherited original ob...
Jacqueline Chen almost 4 years ago in SYNCHRO Modeler 6 Future consideration

Can Due Date on form be defaulted to TODAY()+X number of days?

By default can the due date be "X" number of days from the date the form was created?
Dan Sheldon over 1 year ago in Field / Forms | Forms 1 Will not implement

The Map Layers doesn't support weather

Would like to be able to see Radar and other map-related weather items as you can see in the Map view in Control. This is needed to attach to forms to show why a delay may have happened
Dan Sheldon over 1 year ago in Field / Forms | Forms 0 Future Consideration

Delete or reassign multiple costs at one time

Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher over 1 year ago in SYNCHRO Modeler 0 Future consideration