PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1342 of 1342

Ability to filter/select PDF settings plan sheets by user defined tags.

In the PDF Settings selection under administration in SYNCHRO control we only have the ability to filter by all sheets, published or draft. A document controller needs the ability to have more options available to view plan sheets in case modifica...
David Gallaher over 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Exported 4D synchro .fbx format when linked with 3ds max file texturing is not possible

Our Team is working on one project and our scope is to export 3D model from synchro as .fbx file and link that file into 3ds max to create rendering according to the planned dates from schedule because we need to update that file multiple times as...
Trishi Ashware over 2 years ago in SYNCHRO 4D Pro / Import/Export 1

To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.

As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Future consideration

Can progress be performed without 3D

For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
Derryl Acosta over 4 years ago in Field / Status update | Tasks 1 Planned

Ability to see Section info against each Control through PBI Connector

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Can Due Date on form be defaulted to TODAY()+X number of days?

By default can the due date be "X" number of days from the date the form was created?
Dan Sheldon over 2 years ago in Field / Forms | Forms 1 Will not implement

The Map Layers doesn't support weather

Would like to be able to see Radar and other map-related weather items as you can see in the Map view in Control. This is needed to attach to forms to show why a delay may have happened
Dan Sheldon over 2 years ago in Field / Forms | Forms 0 Future Consideration

Delete or reassign multiple costs at one time

Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher over 2 years ago in SYNCHRO Modeler 0 Future consideration

Cross section selection tool on other views

It can be hard to select lines, items or layers in congested areas of the model. Especially when you have big ol construction fingers. It would be very helpful if the Cross-section selection tool was available on all views for easier model selecti...
Thomas Schimpf over 2 years ago in Field / Models | Tools 0 Future Consideration

Wrap Text for Activity Name

We have very Detailed activity names, and even after Reducing the Task Indent Space reading activity name is still difficult. If we expand the Activity name column then the Activity Start and Finish date will disappear behind the Gantt. Wrap text ...
Sagar Soni over 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration