When we import PDF, the document name is retrieve. We should be able to filter document based on the document name, especially when we wanted to create a new version so the sheets from the same document same will appear at the top of the list all ...
If we wanted to unpublish or delete in batch multiple documents under PDF Settings We do not seems to have this option. Also if we delete a sheet which is at the top of a version pile, only this sheet is delete, we have to redo the same process fo...
When we create a plan set having to fill all mandatory field is time consuming. Most of the info could be fill upstream from PWDI. If we could have 1) An interface with attribute under PWDI and when importing the PDF to Synchro control those attri...
The idea is to push the concept of work package further for vertical infrastructure and large building Instead of being a form, have a complete environment dedicated to Work Package so we can deliver rich work instructions to the field The new env...
View Control on multiple Monitors to improve workflows and clarity
Similar to how designers and split their desktop products onto multiple monitors, can we have this same functionality within Bentley web-based products. An example would be, I would prefer to see the Schedule Gantt Chart and details in one window,...
I like the way Dropbox functions and allows several documents to be scanned or uploaded at one time. I do see value in having a function like that through synchro
Cascading list currently supports only text data type. More data types (number, boolean, dates) should be added so that the cascading list can interact more with Actions.
Add Contingency Transfer (CT) to contract (similar to Change Order)
CT is a line item in the SOV that is already funded and is used to cover the cost for unforseen conditions. This is not added to the contract or SOV as it is already a line item but the CT would document the use of these funds.