Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1312

Stamp a PDF with a custom stamp via a Web Services API call

(MUST) As a Bentley developer I want to be able to stamp a PDF file with an image/text via a Web Service API call using PDFTron (Apryse). (MUST) As a Bentley developer I want to be able to specify the location of the stamp to allow for positioning...
Paul Houghton 10 months ago in SYNCHRO Control / APIs 0 Already exists

Project creation through the API

When creating a project using the ITwin API that project is not visible in SYNCHRO Control. Project creation through the Projects API was a request they made when the Projects API was being migrated into the iTwin API and never responded too.
Russ Campton 10 months ago in SYNCHRO Control / APIs 0

Calendar of non working days

Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
Rocky Ursino 10 months ago in Perform / Reports 1

Shared With in PowerBI Connector

The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Indrawan Wijaya 10 months ago in SYNCHRO Control / APIs 0

Status Visualization color control options

The ability to have wider options for selecting color control within status visualization. Standard and custom colors with an eyedropper option to select a color from the screen.
Jonathan Cunningham about 1 year ago in SYNCHRO Control / Model Viewer 0

Custom layout shown even if the workflow is closed

It will be more efficient if the custom printout or design form layout is shown even if the workflow is closed. This prevents the people from downloading/exporting the form just to see the information inside.
Kimberly Nazareth Angeles about 2 years ago in SYNCHRO Control / Forms 1 Future consideration

Able to progressing for Resource Group to Task

Right now, Field only can do progressing if the Resource directly link to Task, progressing is not working if we link resource group to task. In Pro, sometime we need to link resource group to task for better grow simulation. Need to improve Field...
Indrawan Wijaya almost 4 years ago in Field / Status update | Resources 1 Planned

We want the option to be able to delete FORMS on our own that have been published and filled out.

On the Forms we create for our organization we should have more control of what we can do with our Forms. We would like to be able to delete obsolete forms or move into "Recycle Bin".
David Dudek Jr. almost 3 years ago in SYNCHRO Control / Forms 1 Future consideration

Data Grid - with formula

We want to add formula inside the data grid, so it can do calculation, example the Total Price, it will have value: Quantity * Unit Price. Please see attachment.
Indrawan Wijaya almost 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Change a Form Definition Type after I've started creating a Form

The ability to change Form Definition type to a different type even though I already started creating the Form
Derryl Acosta over 3 years ago in SYNCHRO Control / Forms 0 Future consideration