Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1310

assigning permissions column headings enable

When assigning permissions for a form, where a lot of roles are visible and the admin scrolls down, the permission column headings disappear and has potential for error. It would be nice to have the permission headings enabled at all times. see at...
Kiril Tasev 5 months ago in SYNCHRO Control / Forms 0

PDF Plan set upload from ProjectWise

I want to upload a file to plan sets from a ProjectWise folder using the PW connector
Bill McNamara over 4 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Media Indexing for Field

It would be useful that have all the projects photos on site for project managers to walk around and review by where they are on the project. As a construction site worker, I want to quickly find images and videos in the project repository, so tha...
Matthew Blake over 2 years ago in Field / Forms | Media 0 Future Consideration

Stamp a PDF with a custom stamp via a Web Services API call

(MUST) As a Bentley developer I want to be able to stamp a PDF file with an image/text via a Web Service API call using PDFTron (Apryse). (MUST) As a Bentley developer I want to be able to specify the location of the stamp to allow for positioning...
Paul Houghton 9 months ago in SYNCHRO Control / APIs 0 Already exists

Calendar of non working days

Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
Rocky Ursino 9 months ago in Perform / Reports 1

Shared With in PowerBI Connector

The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Indrawan Wijaya 9 months ago in SYNCHRO Control / APIs 0

NOT to separate 3D objects to cells when exporting to .spx by Plug-in for Micrpstation or importing straght i.dgn/bim to Synchro

It's very unproductive when all compound 3D objects separate to cell after exporting to .spx by Plug-in for Microstation or importing straght i.dgn/bim to Synchro. And any cell doesn't inherit properties (user fields) from compound 3D object It's ...
Дмитрий Павлович Сергеев over 3 years ago in SYNCHRO 4D Pro / Import/Export 2 Future consideration

To select all elements in custom group of 3D objects when click on the group name

Why when I've made a custom group (grouping by User Field) of 3D objects and try to select all elements by clicking on the group name they don't select? I think it have to work, please fix it.
Дмитрий Павлович Сергеев over 3 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

NOT to export nested families as a separate elements from Revit

There is a function in general settings of Plug-In for Revit: Export nested families as a separate elements. But it doesn't work, when untick it still export export nested families as a separate elements. Please, fix it and add the same function t...
Дмитрий Павлович Сергеев over 3 years ago in SYNCHRO 4D Pro / Microstation/Revit/Navisworks Plugins 0 Planned

Changing Baselines, export Baselines from P6 to Synchro

It would be very helpfull to add the ability to change the Baseline dates at any time we need. Just to click to baseline date cell and change it; or export to excel, change there and import back to Synchro. And if you still cannot currently import...
Дмитрий Павлович Сергеев over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 2 Future consideration