Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1301

"Find Similar" feature within in Field App

include a "find similar" tool/feature within the field app when looking for certain 3d elements in the model just like Control's 3D model functionality.
Tony Bonacorsi over 1 year ago in Field / Models | Display 1 Future Consideration

Power BI Connection to SYNCHRO Modeler

Instead of relying on exports to single excel spreadsheets have a connection to Power BI directly to quickly view data generated for cost code assignments into customized dashboards to organize data automatically. This can make setting up estimate...
David Gallaher over 1 year ago in SYNCHRO Modeler 0 Future consideration

Have the ability to see which forms have been escalated or related in the table view

There is no quick way to filter forms to see which forms have been escalated or to see which form it was escalated into. This also applies to related forms. Suggest having an icon next to form prefix in two separate columns (Escalated & Relate...
David Gallaher over 1 year ago in SYNCHRO Control / Forms 1 Likely to implement

Ability to assign multiple roles to new users added to a project

When adding new users to a project, I am only able to assign them one role. In some projects, users will need different roles for different forms. At the moment, to do this one must add a user, assign them one role, then scroll and find the new us...
Charlie Button over 1 year ago in SYNCHRO Control / Admin 0

Improve naming of split objects created by Modeler

Currently names of the 3d objects are not informational and cause inconvenience for distinguishing them. Instead of naming all of them WorkAreaDetailingElement, it may be better to name this split objects by concatenating the inherited original ob...
Jacqueline Chen almost 4 years ago in SYNCHRO Modeler 7 Future consideration

Form Custom Hierarchy

I think it is good to have the Form Hierarchy. It will help user to search the form type if user have Lots of form type. Please see attachment.
Indrawan Gmail over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Have an announcement section at the home page of each project

With this announcement section, we can inform users if there's any downtime of the forms or any other project-related alerts.
Siti Nurhazirah Mokmin almost 4 years ago in SYNCHRO Control / Admin 0 Future consideration

Read clash sets from json/csv

Having the ability to export the clash sets to a file (json or csv) and import it would be extremely useful in projects that use the same workspace and tend to have the same categories. Usually, the sets are populated by certain categories. The fi...
Rafael Ramirez Vizuete 4 months ago in SYNCHRO Control / Clash Detection 0

Adding Tag

When adding tag, we do not seems to have a list of existing tags. Request is to list all the existing tags as we enter a string. Also be able to have a hierarchy tag If we could introduce TAG IA so by doing OCR, tags could be propose and accept by...
Luc Poulin 4 months ago in SYNCHRO Control / Documents 0

Control access to sheet under plan set

It does not seem we can control access to sheet in a plan set. Under Documents we can set folder access Under Connections access is control by PWDI We would require the same access control for sheet under plan set.
Luc Poulin 4 months ago in SYNCHRO Control / Plan Sets 0