Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

SYNCHRO Control

Showing 350

Update Resource Statuses within Control

SYNCHRO OpenViewer can do that and 4D Review/Control is meant to eventually displace that, so makes sense to incorporate this feature. We need to be able to Resource Status directly from within an Inspection/Form iModel attachment. The use case be...
Arpit Prakash over 4 years ago in SYNCHRO Control / Models 0 Future consideration

indicate the escalation info in the pdf report export if one form is escalated to another form

for example, form A is escalated to form B. When form A or form B is exported, it doesn't state the information/statement of this escalation (e.g. form A is escalated to form B) in the export PDF.
Siti Nurhazirah Mokmin over 4 years ago in SYNCHRO Control / Reports 0 Future consideration

direct link between individual model elements to drawings in documents

all elements, if configured, should be linked to live documents on Control when user click on one element, it will take to the right drawing within Control. It could be a tag, an url, or simply the name of the document and stored in the section sh...
Shaohua Guan over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Ability to load multiple projects through Power BI Connector

Currently, I can only load one project at a time - If i want to aggregate data from multiple projects, and I run the Connector, it will create duplicates of the existing tables with a suffix (Query1, Query2, etc.), which becomes very hard to merge...
Arpit Prakash over 2 years ago in SYNCHRO Control 0 Future consideration

PDF version compare in order to view sheet to sheet or older versions and not just to the current.

Some organizations use sperate existing layout sheet and proposed layout sheet, I want to able to compare the two different sheets. When multiple revision sheets exist for a single sheet, I would like to be able to compare the revisions, i.e. vers...
Kerry Newbanks over 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

See Cost Codes in Control

Want to see Cost Codes assinged in Modeler in Control on the elements
Dan Sheldon over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Create actions based on multi assign

Multi Assign is bound to 'Assigned Users', but we cannot create actions from that binding. We would like to be able to do so.
Arnar Agustsson over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Permissions based on status in the workflow

It should be possible to define permissions based on status in the workflow. So for example when an issue hits a specific status only certain roles are allowed to modify, while though still being visible to other roles.
Arnar Agustsson over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

SYNCHRO 4DPro / Forms do not include the delivery of Inspection Forms

Inspection requirements, although populated in SYNCHRO Control - does not show in Forms within SYNCHRO 4DPro. Note - SYNCHRO Custom Forms do show in 4DPro. Is this worth pursuing with all the changes going ahead?
Guest over 2 years ago in SYNCHRO Control / Inspection 0 Future consideration

Consistent user experience for searching and filter in My Work vs Form table

I like the all-encompassing search and filter options in the Form lists, which are not available in My Work. 
Arpit Prakash over 2 years ago in SYNCHRO Control / Forms 0 Future consideration