Use case for escalated forms is when an issue is encountered. then the Donor form has to wait until all issues are resolved and only then to be progressed. Provide ability to track at least teh status/state o fthe escalated forms i.e. xxx escalate...
Currently the only way to see the escalated/related forms is through PDF export and explicitly chosing the AUdit trail. Even so, the forms are presented in chronological order mixed with other changes to teh form data. Users want to see an easy or...
When using Synchro for a large building construction, we would like to have the possibility to along with the geolocation (X,Y) add the height to represent the different floor of the building. This will be important as some PDF will share the same...
Currently, the way this is set up is to remove access for one Role, all other Roles need to be given access, by manually checking on each. If we had a bulk update option, it will be easier to simply remove the restricted users.
We like the use of forms to manage temporary construction assets such as Traffic Control Devices and Stormwater Management. These items require daily to weekly maintenance. In order to show inspection happened on a project wide basis, bulk editing...
To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.
For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas
over 3 years ago
in SYNCHRO Control
1
Future consideration