Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

SYNCHRO Control

Showing 367

Synchro Control footnotes and annotation

My team are currently using 4D pro to create our 4D models. However, the various disciplines within the design team cannot view the model as they do not have Synchro software on their laptops. I noticed Synchro viewer is an option however this sof...
Marc Jaikaran almost 3 years ago in SYNCHRO Control 1 Future consideration

Hide grid on print view when empty

I need to hide a Grid on the Print out of a form when there is not data or lines add to the grid. See attached word document for action I am using. This action always hides the grid on the PDF print view. I am doing this action in the "Design Prin...
Alan Spurgeon about 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Markup PDF Form Attachments

Currently users are unable to Markup PDFs from Form Attachments. It is expected when a Form is opened and users quickly view the attachements that there will be a markup ability to add comments and pass it through the workflow. It would be great i...
Guest about 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to load multiple projects through Power BI Connector

Currently, I can only load one project at a time - If i want to aggregate data from multiple projects, and I run the Connector, it will create duplicates of the existing tables with a suffix (Query1, Query2, etc.), which becomes very hard to merge...
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Future consideration

PDF version compare in order to view sheet to sheet or older versions and not just to the current.

Some organizations use sperate existing layout sheet and proposed layout sheet, I want to able to compare the two different sheets. When multiple revision sheets exist for a single sheet, I would like to be able to compare the revisions, i.e. vers...
Kerry Newbanks over 1 year ago in SYNCHRO Control / Plan Sets 0 Future consideration

Create actions based on multi assign

Multi Assign is bound to 'Assigned Users', but we cannot create actions from that binding. We would like to be able to do so.
Arnar Agustsson over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Permissions based on status in the workflow

It should be possible to define permissions based on status in the workflow. So for example when an issue hits a specific status only certain roles are allowed to modify, while though still being visible to other roles.
Arnar Agustsson over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

SYNCHRO 4DPro / Forms do not include the delivery of Inspection Forms

Inspection requirements, although populated in SYNCHRO Control - does not show in Forms within SYNCHRO 4DPro. Note - SYNCHRO Custom Forms do show in 4DPro. Is this worth pursuing with all the changes going ahead?
Guest over 1 year ago in SYNCHRO Control / Inspection 0 Future consideration

Consistent user experience for searching and filter in My Work vs Form table

I like the all-encompassing search and filter options in the Form lists, which are not available in My Work. 
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Turn off Files

Is it possible to turn of Files option completely and rely only on a PW Connection?
Guest about 3 years ago in SYNCHRO Control / Documents 0 Future consideration