In the 'Work' area as you add more forms the list just gets longer. It would be a good idea to have an expanding folder structure instead of a long list, as it is easier to navigate. This also assists with identifying different work areas and what...
Infrastructure Cloud - Help Link only Show ProjectWise Link
When we use Infrastructure Cloud Link, and open SYNHCRO project, the Short Cut Link in top Right (just before Profile) still show ProjectWise link. I think need to change to SYNCHRO if we are opening SYNCHRO Project.
Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.
Currently in synchro Control \ Schedule the animation is starting at the Project Start Date.
Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control
1
Future consideration
Ability to filter/select PDF settings plan sheets by user defined tags.
In the PDF Settings selection under administration in SYNCHRO control we only have the ability to filter by all sheets, published or draft. A document controller needs the ability to have more options available to view plan sheets in case modifica...
It would be great if we can have the search function for documents within SYNCHRO Field. We have a client who is about to upload approx. 100 pdfs per day in Control-documents, pdfs which will be opened by inspectors on site. Imagine someone on sit...