Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1323 of 1323

Ability to read a QR/bar code in forms

Ability to read a QR/bar code in forms and use the infrmation for: populating a textbox/numberbox link to documents/data n SYnchro/alim/PW compare the data to a data linked from ALIM e.g. asset numbers
Kiril Tasev 9 months ago in Field / Forms | Forms 0

Export to Synchro plugin for Revit 2024

Export to Synchro plugin for Revit 2024 to be introduced soon as many of our projects is on hold due to this.
Abhijiti joshi almost 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Planned

To have the possibility in Synchro Control \ Schedule to display several 3D Windows based on different dates: current / baseline(s).

To be able to import in Synchro Control a Synchro 4D Pro .sp file which contains two or more 3D Windows. Different dates (i.e. current, baseline(s)) being used per 3D Window. To have all 3D Windows created in Synchro 4D Pro displayed in Synchro Co...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Form Custom Hierarchy

I think it is good to have the Form Hierarchy. It will help user to search the form type if user have Lots of form type. Please see attachment.
Indrawan Gmail over 2 years ago in SYNCHRO Control / Forms 0 Likely to implement

Composite iModels not usable for Synchro scheduling

Please add the option to use the composite iModels for Scheduling services, now it's not possible to filter out data from an existing iModel and start working with Synchro 4D
Christiaan Post 5 months ago in SYNCHRO Control / Models / Schedule 0

Media indexing filter on photo taken date

Now date filter considers both photo uploaded date and taken date which could be different each other. To know the field evolution over time, it will be useful to have the possibility to filter on the taken date only.
Roberto Giove 9 months ago in SYNCHRO Control / Media Indexing 0

Provide hosting service for Apps/scripts

Provide hosting service for apps/scripts to run on cloud service as a backend. Provide options for python, php, javascript with working IDE to allow users to develop in sandbox mode and run in production mode service application scripts that inter...
Kiril Tasev 5 months ago in SYNCHRO Control / APIs 0

4D Planned Vs Actual window Dashboard in Control

the 4D Planned Vs Actual scenario comparison should be visible in SYNCHRO control . It will boost the management review also that they may refer issues dashboard , power BI dashboard and Planned Vs actual delay analysis within the same browser its...
Prateek Singh over 2 years ago in SYNCHRO Control / Reports 0

Synchro Modeler idea: Generating surfaces from Work Areas in Synchro Modeler

Hi Synchro team, We are running a pilot on a road and bridge project with Synchro 4D Pro including Control, Modeler and Synchro 4D Pro. The designers are currently working on both the road and civil design. We would like to start scheduling and si...
Stephan Klotz almost 4 years ago in SYNCHRO Modeler 0 Needs review

SMU in Matrix

We have start and finish time in Matrix. For plant, could we have start and finish SMU in Matrix
Nageshwar Sesetti over 2 years ago in Perform / Timesheets 1 Future Consideration