Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1304

To have the possibility to define a look-ahead filter for the Gantt window accessible from Synchro Control \ Schedule

Currently all Schedule Tasks within the Synchro 4D Pro .sp file are displayed in the Gantt Window accessible from Synchro Control \ Schedule. As we can have several thousands of Activities, it will be difficult for User to understand which are th...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 1 Future consideration

Collapse Up / Collapse Down Function & Keyboard Shortcut in Tables (Resources, 3D, Activity)

We would like to be able to quickly jump up or down in the hierarchy of the various tables in Synchro 4D. Ctrl + [ to collapse up one level Ctrl +] to expanded down one level Ctrl +- to collapse all Ctrl + = to expand all For example: An activity ...
Mike Ranney 10 months ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 1

Plan Revision Notifications

Notify users through e-mail when plan revisions are published.
David Gallaher about 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Display Resources Tree in Synchro Control \ Schedule

To have the possibility to access in Synchro Control \ Schedule the Resources Tree as defined in Synchro Pro. With possibility, in Synchro Control \ Schedule, to navigate between Resources window, 3D window and Gantt window the same way than in Sy...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 1 Future consideration

Delete Bindings

Want the ability to Delete a Binding(s) that are unused and unassigned on FORM Definitions
Derryl Acosta over 3 years ago in SYNCHRO Control / Forms 2 Planned

Imodel Saved Views - Don't turn on new content by default

Currently, if we add new levels or new references to our source DGN files and then re-sync imodels, those new elements get turned on in every saved view. We don't want this. We want the option to turn on new content but to not have it alter our ex...
Ariel Froerer 7 months ago in SYNCHRO Control / Model Viewer 0

Support to bulk upload Rates in Perform

Current method of loading and updating rates individually into Perform needs the ability to bulk create and needs to include notation to allow information on source
Ernest Downes over 2 years ago in Perform / Dockets 0 Future Consideration

Delete or archive project templates

Organization admins may create multiple project templates and determine that some, or many, should be deleted or archived due to changing template needs. An admin should have the ability to select from a list of the project templates any that shou...
Ryan Posnikoff about 2 years ago in SYNCHRO Control / Admin 1 Planned

Work Area Detailing - 3D properties of the Detailing Elements

Please allow for maintaining the original 3D object's properties as much as possible in the subdivided elements. It is much harder to utilise the filter feature when the subdivided elements lose core 3D properties like "element identifier".
Patryk Makowski 11 months ago in SYNCHRO Modeler 0 Needs review

Ability to see Section info against each Control through PBI Connector

No description provided
Arpit Prakash 7 months ago in SYNCHRO Control / Forms 0