Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1297

Hide previous version under Connection

In the vatical ellipse menu ( vertical three dots top right) add the option to hide previous version. (I suspect that version will find their way to Documents as well so same will need to be deploy when versions are available under documents) In t...
Luc Poulin 3 months ago in Field / Documents | Connections 1 Planned

PDF Settings filter by document name

When we import PDF, the document name is retrieve. We should be able to filter document based on the document name, especially when we wanted to create a new version so the sheets from the same document same will appear at the top of the list all ...
Luc Poulin 3 months ago in SYNCHRO Control / Admin 0

Unpublish or delete in batch

If we wanted to unpublish or delete in batch multiple documents under PDF Settings We do not seems to have this option. Also if we delete a sheet which is at the top of a version pile, only this sheet is delete, we have to redo the same process fo...
Luc Poulin 3 months ago in SYNCHRO Control / Admin 0

Guests - option to have no Table / Calendar / Map buttons

We are using Synchro Control for guests to view the 4D model only and are not using any other features of Control. When a Guest logs into Synchro Control, it loads up for them on the Table tab and they see text saying: 'You have no assigned work'....
Ruth Fuller 11 months ago in SYNCHRO Control / Models 0

Schedule: Layouts, Viewpoints, 3D Filters, Filters

Please improve the functionality of Schedule on the Control Portal so that it is possible to activate Layouts, Viewpoints, 3D Filters and Filters that have been created in Synchro 4D Pro. This will bring it closer to the functionality of Synchro O...
Ruth Fuller over 1 year ago in SYNCHRO Control / Schedule 1

Math Function for Date time and Date

If we can do more calculation for the DateTime and Date component. Example: Get the Duration between two date or date time. the duration will be number, can be set as day our hour or minute. Can add a Date component with number box component. Righ...
Indrawan Gmail over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Plant Set Search

We do not seems to be able to Search by: Sheet name Revision description Alignment name
Luc Poulin 3 months ago in Field / Documents | Plan set 0 Future Consideration

Plan Set automation

When we create a plan set having to fill all mandatory field is time consuming. Most of the info could be fill upstream from PWDI. If we could have 1) An interface with attribute under PWDI and when importing the PDF to Synchro control those attri...
Luc Poulin 3 months ago in SYNCHRO Control / Plan Sets 0

Workpackage/plant set

The idea is to push the concept of work package further for vertical infrastructure and large building Instead of being a form, have a complete environment dedicated to Work Package so we can deliver rich work instructions to the field The new env...
Luc Poulin 3 months ago in SYNCHRO Control / Plan Sets 0

Disable permissions that are not relevant to Access

For example, if a Role only has Field access, the rest of the permissions that do not correspond to it, like Admin, should be greyed out -
Arpit Prakash over 1 year ago in SYNCHRO Control / Admin 0 Future consideration