Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

SYNCHRO Control

Showing 367

Allow AssignedUsers to be automated through csv upload

Assigned Users property is essential and critical in managing form visibility when Is Private is set to True. This is necessary in complex subcontractor structures where the parties needs to be isolated from each other and still use the same Form ...
Kiril Tasev about 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Provide option to see project owners/creator in Synchro Control Projects screen

Provide option to see project owners/creator in Synchro Control Projects screen. Currently this is not possible from the main register, and I have to click into teh projec to see details.
Kiril Tasev about 1 year ago in SYNCHRO Control 0 Future consideration

Allow defining permissions based on conditions

It should be possible to set conditions that trigger certain permissions. As an example, a sub-contractor could have different permissions based on the discipline of the form that is being raised. The electrical sub might be a direct participant i...
Arnar Agustsson about 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Automatically add the user's role to the multi-assign for forms with IsPrivate enabled

When the IsPrivate binding is enabled on a form, it can be tricky to ensure that all relevant users have access. The creator always gets access but others need to be added manually. This can be partially done with scripting but there is still a ke...
Arnar Agustsson about 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Please, make that the style is not inherited by controls inserted within other controls. - CS0115180

Technically this should be classed as bug. When inserting styled controls in a region, the child controls are inheriting the style definition of the parent Region. This causes confusion and the way around is to go and edit the style of the child c...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Allow custom notification on screen at custom transition

In the same way that we are able to raise a custom notification to user from Scripts it would be useful to be able to raise Custom notifications to users when trying to transition and there is a condition that has not been met. This notification c...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Publish from PW Create Rendition to SYNCHRO Control PDF

Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
Dan Sheldon almost 4 years ago in SYNCHRO Control / Plan Sets 1 Future consideration

Project Location - Import project boundary from CAD file

User asked if a function to import the project location from a CAD drawing can be added to Project Location setup page. Basically import the boundary rather than drawing it on the map. It would be helpful for very long linear projects.
Alexandru Buzan almost 4 years ago in SYNCHRO Control / Admin 0 Future consideration

Desktop issues to synchro control browser

When I create an issue in an synchro control project using the desktop software, I would like this issue to come visible in the browser based system too and vice versa.
Guest almost 4 years ago in SYNCHRO Control 0 Future consideration

Showing and hiding the button in the SYNCHRO Control Portal

The ability to show and hide the buttons on the left hand side of the portal. We are using SYNCHRO Control to involve stakeholders without having to install the SYNCHRO Open Viewer. We are not using documents, forms, inspections or dashboards in t...
Stephan Klotz almost 4 years ago in SYNCHRO Control / Admin 0 Future consideration